Return to flip book view

References - Miller Flooring Co.

Page 1

SPORTS CONSTRUCTION DIVISION

Athletic Surfaces & Equipment

Page 2

FORESTVILLE ELEMENTARY SCHOOL

Contact: Vince Satmyer, Construction Supervisor
Office of Design and Construction
Fairfax County Public Schools
Tel: 571.423.2235
Email: vhsantmyer@fcps.edu


Projects:

Installation: Taraflex Sport M Plus over Isoport

REFERENCES


Page 3

Projects:

Transition of urethane to Mondo (Advance/resilient) surface
with graphics and game lines

THE SHIPLEY SCHOOL

Contact: Robert Meals, Director of Physical Plant
Tel: 610.525.8250
Email: rmeals@shipleyschool.org

REFERENCES


Page 4

MASTERY CHARTER SCHOOL (EAST) CAMDEN

Contact: Linn Corsey
Tel: 215-866-9000

Project:

Urethane to Wood Surface with game lines
Equipment (Backboards)

REFERENCES


Page 5

Projects:

Carpet to Mondo (Advance 8mm) with game lines

PINE GROVE ELEMENTARY SCHOOL (Pine Grove Area School District)

Contact: Henry Snyder, Director of Buildings & Maintenance
Tel: 570.345.2731 x257
Email: hsnyder@pgasd.com

REFERENCES


Page 6

Projects:

Vinyl to Mondo (Advance) surface
with games and base

LOWER GWYNEDD ELEMENTARY SCHOOL (Wissahickon School District)

Contact: Gerry Moore, Director of Facilities
Tel: 215-619-8000 ext 1715
Email: gmoore@wsdweb.org


REFERENCES


Page 7

HAMBURG AREA MIDDLE SCHOOL

Contact: Ryan Crosby
Balton Construction
Tel: 717-725-1903
Email: office@baltonconstruction.com

Projects:

Urethane to Wood Surface Installation
Airflow System 

REFERENCES


Page 8

COLLEGIUM CHARTER SCHOOL 

Contact: Shannon Leach, Operations
Tel: 610.903.6300
Email: sleach@ccs.us


Projects:

VCT to Mondo (Advance)
Bleachers
Scoreboards
Wall Pads
Volleyball Equipment

REFERENCES


Page 9

SPORTS CONSTRUCTION DIVISION Athletic Surfaces Equipment share phone email web