INSTALLATION INSTRUCTIONS LA JOLLA SHOWER FITS 56 1 2 TO 59 WIDE OPENINGS 24 07 18 Rev 1 0
CONFIGURATIONS THIS CONFIGURATION IS ILLUSTRATED IN THIS MANUAL NOTE THE LA JOLLA ENCLOSURE IS REVERSIBLE FOR LEFT OR RIGHT SIDE SHOWER HEAD CONFIRGURATIONS THIS MANUAL WILL SHOW THE LEFT SIDE SHOWER HEAD INSTALLATION FOR RIGHT SIDE SHOWER HEAD INSTALLATION SIMPLY BEGIN ON THE OPPOSITE WALL AND REVERSE THE ORIENTATION OF THE PARTS AS NECESSARY 1
Assembly Drawing 10 11 10 10 10 9 9 9 4 1 3 9 5 5 3 4 1 4 1 3 5 5 4 8 2 3 1 8 4 1 3 5 4 7 13 12 1 7 5 6 3 2 1 PACKING LIST PART 1 DESCRIPTION Wall Plugs 2 Wall Jamb L R x 1 for each Q TY PART 14pcs 8 Handle 2pcs 2pcs 9 Anti lift Pins 4pcs 4pcs DESCRIPTION Q TY 3 Screw ST4x1 3 8 12pcs 10 Rollers 4 Bumpers 12pcs 11 Track 1pc 5 Screw ST4x 3 8 12pcs 12 Bottom Guide 1pc 6 Aluminum Threshold With Seal 1pc 13 Countersunk Screw ST4x1 3 8 2pcs 7 Door Panel 2pcs 14 Installation Kit 1set 2
Inspect the product immediately upon receipt for transit damage missing packs parts or manufacturing defects Handle the product with care Do not set on hard surface and protect all edges and corners from impact Tempered glass is up to 4 times stronger than annealed glass but edges and corners can be very fragile Si l ic o ne Notes Read these instructions carefully before start of installation Special care should be taken when drilling walls to avoid hidden pipes or electrical cables Note This product is heavy and may require two people to install 2 PHILLIPS INSTALLATION KIT 14 1 4 Wrenches 3 Masonry Bits Sealant Finishing Tool Allen Wrenches Painters Tape Installer Templates
STEP 1 FINDING CENTERLINE OF CURB TO FIND CENTERLINE PLACE TEMPLATE A ON CURB AND MATCH NUMBERS 3 3 2 2 1 1 1 1 2 2 3 3 4 9 12 15 6 3 3 6 15 12 9 5 4 4 4 CENTERLINE WALL CURB 5 9 12 15 6 3 6 15 12 9 9 12 15 9 12 15 6 6 3 3 3 3 6 6 CURB 15 12 9 15 12 9 3 ON FRONT AND BACK EDGES OF CURB AND MARK CENTERLINE 4
STEP 2 INSTALLING BOTTOM GUIDE LINE UP CENTERLINE ON TEMPLATE B WITH CENTERLINE ON CURB PEEL OFF TABS AND CENTERLINE STICK TEMPLATE ONTO CURB DIAGRAM A B AND C A OVERHEAD VIEW WALL CENTERLINE B EQUAL CURB CENTERLINE B LEFT SIDE C EQUAL DISTANCES OVERHEAD VIEW CENTERLINE MARK AND DRILL HOLES FOR BOTTOM C EQUAL GUIDE DIAGRAM D AND E INSTALL BOTTOM GUIDE DIAGRAM F RIGHT SIDE 12 13 Screw ST4x1 3 8 CENTERLINE 1 4 1 D 5 E F
STEP 3 INSTALL ALUMINUM THRESHOLD MEASURE OPENING BETWEEN BOTH WALLS AS PER THE BELOW ILLUSTRATION DIAGRAM A CUT THRESHOLD BASED OFF MEASUREMENT B OBTAIN MEASUREMENT B BY TAKING MEASUREMENT A AND SUBTRACT 1 2 DIAGRAM B PLACE THRESHOLD ONTO CURB AND BOTTOM GUIDE DIAGRAM C AND D 6 13 MEASUREMENT A INTERIOR SHOWER SIDE A 6 C OVERHEAD VIEW 13 6 A 1 2 B 6 MEASU REMEN TB EQUAL DISTANCES B D 13 6
STEP 4 INSTALL WALL JAMBS PLACE WALL JAMB ONTO CURB AND OVER ALUMINUM THRESHOLD DIAGRAM A ENSURE CENTERLINE ON WALL JAMB LINES UP WITH CENTERLINE ON CURB DIAGRAM B USE A LEVEL TO PLUMB AND MARK WITH PENCIL FOR DRILLING DIAGRAM C DRILL HOLES IN WALL DIAGRAM D INSTALL WALL JAMB DIAGRAM E REPEAT THIS STEP FOR OPPOSITE WALL 2 C C C C C C C INTERIOR SHOWER SIDE A 6 B D E 2 1 4 3 Countersunk Screw ST4x1 3 8 7 NOTE WALL JAMBS MUST NOTE DIP DRILL BIT IN BE PLUMB COOL CUP OF WATER DURING DRILLING
STEP 5 INSTALL GLASS GRIPPERS 2 4 5 NOTE DO NOT USE POWER DRILL TIGHTEN SCREWS BY HAND USING SCREWDRIVER 8
STEP 6 INSTALLING ROLLERS ON INTERIOR DOOR 7 7 10 NOTE DO NOT INSTALL ROLLER CAP AT THIS POINT Eccentric nut for roller adjustment Raises and lowers the roller Minimum spacing should be oriented towards the middle as shown for all rollers and pins STEP 7 LEAN INTERIOR DOOR AGAINST WALL INSIDE SHOWER 7 7 10 INTERIOR SIDE BACK WALL 9 SIDE VIEW INSIDE SHOWER EXTERIOR SIDE
STEP 8 INSTALL ROLLERS ON EXTERIOR DOOR 7 7 10 NOTE DO NOT INSTALL ROLLER CAP AT THIS POINT Eccentric nut for roller adjustment Raises and lowers the roller Minimum spacing should be oriented towards the left side as shown for all rollers and pins STEP 9 LEAN EXTERIOR DOOR AGAINST WALL OUTSIDE SHOWER 7 7 10 EXTERIOR SIDE INTERIOR SIDE BACK WALL SIDE VIEW OUTSIDE SHOWER 10
STEP 10 INSTALL TRACK MEASURE OPENING BETWEEN BOTH WALLS ABOVE WALL JAMBS DIAGRAM A CUT HEADER BASED OFF MEASUREMENT B OBTAIN MEASUREMENT B BY TAKING MEASUREMENT A AND SUBTRACT 3 8 DIAGRAM B INSTALL HEADER DIAGRAM C MEA SURE MEASUREMENT A A 3 8 B A B 2 11 C 11 C MEN TA
STEP 11 HANG DOORS HANG BOTH DOORS DIAGRAM A AND B IF DOORS ALIGN PROPERLY WITH SIDE WALL INSTALL ROLLER CAPS DIAGRAM C AND GO TO STEP 12 IF NOT REFER TO STEP 11A 7 7 INTERIOR SHOWER SIDE SIDE VIEW A B C 12
STEP 11A ALIGNING DOORS TO WALL ROTATE ROLLERS TO CLOSE GAPS USING PROVIDED ALLEN WRENCH AS SHOWN DIAGRAM A ONCE ALIGNED TIGHTEN ROLLER SCREW AND INSTALL ROLLER CAP DIAGRAM B AND C A B EXTERIOR VIEW 10 10 B C NOTE LOOSEN SCREW 1 TO 2 NOTE HOLD ALLEN WRENCH INTERIOR VIEW TURNS TO RELEASE PRESSURE IN PLACE WHEN TIGHTENING A SCREW 13
STEP 12 INSTALL ANTI LIFT PINS 10 11 LEAVE 1 16 TO 1 8 BELOW TRACK BY ROTATING A 9 BUSHINGS DIAGRAM A B C ONCE IN CORRECT LOCATION HOLD BUSHING IN PLACE WITH WRENCH AND TIGHTEN DOWN WITH SECOND WRENCH DIAGRAM D INSTALL ANTI LIFT PIN CAP DIAGRAM E REPEAT STEP FOR ALL FOUR ANTI LIFT PINS B SIDE VIEW 1 16 1 8 10 11 C EXTERIOR VIEW 9 1 16 1 8 10 11 D 9 EXTERIOR VIEW 10 11 E 9 14
STEP 13 INSTALL HANDLES 7 PLASTIC BUSHING PLASTIC BUSHING 8 WASHER WASHER 8 5 8 A 7 1 4 B KNOB KNOB 5 8 1 4 WASHER WASHER TUBE PLASTIC TUBE BUSHING PLASTIC BUSHING PLASTIC PLASTIC A B KNOB SIDE VIEW INTERIOR EXTERIOR 1 4 KNOB 5 8 C 15
STEP 14 APPLYING SILICONE A WIPE DOWN AREAS SHOWN WITH CLEAN CLOTH AND DENATURED OR ISOPROPYL ALCOHOL INTERIOR AND EXTERIOR WIPE ALL SURFACES WITH A CLEAN CLOTH TO ENSURE AREAS TO BE SILICONED ARE FREE OF DEBRIS B TAPE OFF AREAS SHOWN WITH PAINTERS TAPE INTERIOR AND EXTERIOR 1 16 1 8 ON METAL SIDE PAINTERS TAPE 1 16 1 8 ON TILE SIDE 16
C CUT OFF TIP OF CAULKING TUBE AT AN ANGLE 45 1 4 D APPLY CAULKING AS SHOWN ENSURE CAULKING IS ADDED TO AREAS REPRESENTED BY THE DOTTED LINE 17
E TOOL WITH PROVIDED SEALING FINISHING TOOL INTERIOR AND EXTERIOR USE PROVIDED SEALANT FINISHING TOOL TO SMOOTH OUT AND REMOVE EXCESS SILICONE F REMOVE TAPE INTERIOR AND EXTERIOR 18
G LET CAULKING CURE FOR 48 HOURS BEFORE USE 48 19 HOURS