Elevated MassTimberBrochure 2024

Page 1

1MASS TIMBERERECTION SERVICES

Page 2

BORREGASELEVATED ROLE Design-AssistErectionGENERAL CONTRACTORXL ConstructionARCHITECTMGA, SERASTRUCTURAL ENGINEER EquilibriumSUNNYVALE, CAAs an integral part of the design-build team, Elevated contributed to the building’s success, starting in the design phase of the project. The team collaborated with the GC and client to construct a full-scale, two-story timber bay mock-up and, together with the greater design-build team, participated in material testing that informed the final design and project execution plan. In addition, Elevated contributed to constructibility reviews and options analysis during preconstruction and played a key role in early timber receipt, storage, staging, and timely erection on this large-scale, complex mass timber project.

Page 3

3182,000 sf. 5-story office building.First mass timber facility for this client and the City of Sunnyvale.96% Embodied carbon savings versus a concrete and steel building.The benefits of a Design-build Partnership Engaging Elevated Construction Services early adds value in terms of cost, schedule, and quality. We have been an essential design-build partner, allowing for early timber receipt, storage, and timely erection on several large-scale, complex mass timber projects.This project used Forest Stewardship Council Certified wood

Page 4

JAVAELEVATED ROLE Design-AssistErectionRough CarpentrySiding InstallationGENERAL CONTRACTORXL ConstructionARCHITECTMGA, SERA, RMWSTRUCTURAL ENGINEER EquilibriumSUNNYVALE, CAElevated continues to expand our expertise as erector for three mass timber structures on this Sunnyvale campus. The team performed installation of all siding, as part of our architectural carpentry scope, and were an essential part of the design-build team from very early on, playing a key role in early timber receipt, storage, and timely erection on these three large-scale, complex mass timber buildings. Honoring the client’s environmental stewardship goal, the project was designed and is being built to LEED Platinum certification standards.3 mass timber buildings, including a six-story office building, an events beacon, and a fitness center.Targeting LEED Platinum.Constructed with maximum interior flexibility to accommodate post-COVID work styles. This project used Forest Stewardship Council Certified wood

Page 5

5EVENTS BEACONThe events beacon features a reciprocally framed roof that spans 70 feet without additional column support.FITNESS CENTERThe fitness center has timber roof cantilevers on three sides and is supported by two-story glulam columns.Composite Beam InstallationThe six-story office building features exposed timber for interior finishes. To meet the California Building Code height limit of 85 feet, the design-build team used a composite system with flat beams affixed to a concrete topping slab using HBV connections. The team used 40-foot spans of 14-inch-deep beams to achieve a high ceiling that complied with building code floor-to-floor height restrictions while also accommodating a raised access floor for MEP systems. 5

Page 6

THE LIGHTHOUSEELEVATED ROLE ErectionGENERAL CONTRACTORXL ConstructionARCHITECTGenslerSTRUCTURAL ENGINEER ARUPCONFIDENTIAL CLIENT | SOUTH SAN FRANCISCO, CAThis 22,000 s.f. mass timber building is a shared amenity space for a group of biotech companies in South San Francisco and includes a café and dining space, lounge, meeting center, fitness facility and private offices. The Lighthouse is the only open-to-the-public building in the region built entirely of mass timber and it will serve as an education opportunity for how to build in a more environmentally responsive way. CERTIFICATIONSLEED GoldAll ElectricNet Zero EnergyAWARDS2022 Wood Design Award Beauty of Wood Category, Woodworks

Page 7

7Mass Timber in its Purest FormCLT panels are supported by an intricate glulam framing system, allowing the structure to also serve as an exposed wood finish. Elevated installed 20-foot double cantilevered overhangs, which required extensive planning, shoring and temporary support measures. These structures provide outdoor seating areas and solar protection to minimize heat gain, which helps contribute to the project’s net-zero energy goals.This project used Forest Stewardship Council Certified wood22,000 sf. single-story amenities center.20 ft. double cantilevered overhangs that provide outdoor seating areas as well as solar protection

Page 8

SONOMA ACADEMYELEVATED ROLE ErectionGENERAL CONTRACTORXL ConstructionARCHITECTWRNS StudioSTRUCTURAL ENGINEER Mar Structural DesignJANET DURGIN GUILD & COMMONS | SANTA ROSA, CASonoma Academy’s Janet Durgin Guild & Commons is a 20,000 s.f., two-story building and one of Sonoma County and Elevated’s most sustainable projects. As Elevated’s first mass timber project, back in 2018, we performed mass timber erection as well as architectural carpentry that included the installation of all siding. CLT was utilized for the roof deck, one of the earliest examples of mass timber in the Bay Area. All wood-based products in the building are sustainability sourced or reclaimed from local sites. For example, the redwood paneling in the dining area was reused from an old house in Mill Valley. The CLT in the commons building extends the warmth of the trellis into the eaves of the building, providing a sense of connection to nature.

Page 9

9AWARDS2019 Acterra Sustainable Built Environment Award2019 Regional Excellence Wood Design Award2019 IIDA Northern California Honor Awards’ Long View Award2018 AIA San Francisco Design Citation Award2018 AIA Committee on the Environment Top Ten Green Projects Award 2019 Architizer A+ Award Winner in both the Concepts and Architecture + Collaboration categories2020 AIA Redwood Empire Merit Award, Architecture – Built2020 AIA East Bay Design Awards Excellence in Design for Well-Being

Page 10

In partnership with Aedis Architects, Daedalus Structural Engineering, and XL Construction, Elevated delivered the first TimberQuest mass timber project for Sacred Heart Schools. TimberQuest is a cost and schedule efficient, prefabricated, DSA pre-checked solution that provides 21st-century learning environments within a high-quality, healthy, and sustainable mass timber facility. The project is approximately 4,000 s.f., containing four 1,000 s.f. classrooms, each with a restroom. This project was built out with a quick turnaround of 11 weeks, during the summer, with classrooms ready for students to return to school in the fall. The general contractor was able to add efficiency and speed to the project by consolidating multiple trade scopes, including mass timber erection, rough carpentry, and building and site specialties work, under the Elevated contract. One crew with eight workers completed erection of this innovative project in four weeks and with a total of 1,280 hours worked.4,000 sf. school building with four classrooms.11 week construction (breaking ground to occupancy).Prefabricated mass timber wall and roof assembly.ELEVATED ROLE ErectionGENERAL CONTRACTORXL ConstructionARCHITECTAedisSTRUCTURAL ENGINEER DaedalusSACRED HEARTATHERTON, CA

Page 11

11Scan to learn more about the Sacred Heart TimberQuest classroomAbout TimberQuest™ Prefabricated Mass Timber Classroom BuildingsTimberQuest™ offers sustainable solutions for high-quality, cost-competitive education facilities, including options that are California Division of State Architect (DSA) pre-approved for rapid installation at K-12 public and private schools and community colleges. Key features include:• DSA Pre-Check (PC) approved options.• 50-75% faster schedule than traditional construction.• Cost is much lower than traditional construction.• Flexible single- and two-story designs that can accommodate more than 20 classrooms.• 50+ year building—high quality materials and detailing that will last at least two generations.• Exceeds Title 24 standards by 35-60%. • Solar and net zero capable.• Can reduce embodied carbon a minimum of 45% vs. traditional building types.• Natural materials and abundant natural light to improve student and staff performance.

Page 12

ADMINISTRATIVE SUPPORT BUILDINGELEVATED ROLE ErectionGENERAL CONTRACTORXL ConstructionARCHITECTRMWSTRUCTURAL ENGINEER Degenkolb EngineersOAKLAND, CAMass timber was the recommended structure for this Administrative Support Building, offering an opportunity to improve the interior environment, user experience, and utility services and increase assignable square footage. The XL+RMW team worked to drive the design to achieve the budget established by UCSF while maintaining the mass timber structure that the health system strongly desired.

Page 13

1331,000 sf. 3-story administrative support building1st Mass timber building for the UCSF SystemLEED Gold TargetThrough Target Value Design, the team identified a steel core that reduced cost while featuring mass timber from the exterior inward for a consistent biophilic experience. Construction is set to commence in Summer of 2024.

Page 14

SSF WELLNESS CENTERELEVATED ROLE ErectionGENERAL CONTRACTORXL ConstructionARCHITECTSmithGroupSTRUCTURAL ENGINEER Buehler EngineeringSOUTH SAN FRANCISCO, CACalifornia’s first mass timber healthcare facility will be home to HCAI-3 clinical care spaces on the first floor and County administrative and support services on the upper floors. With sustainability top of mind, the County of San Mateo is targeting LEED Gold for this primarily electric building that includes recycled materials and, being mass timber, will emit significantly less embodied carbon than a concrete and steel building. The building features raised access floors for power and data instead of a more traditional above ceiling configuration.

Page 15

1578,000 sf. HCAI-3 Medical Office Building1st Mass timberhealthcare faciity in CALEED Gold TargetThe clinic will provide express care, primary care, pediatric care, dental services, and optometry services for northern county residents. The plans call for a multi-purpose conference area, able to convert to an emergency operations center. The building will also house the County’s Women Infants and Children (WIC) and Aging and Adult Services (AAS) Departments. The project includes demolition of an existing building and is located adjacent to an active historic courthouse. Construction is set to commence in Summer of 2024.

Page 16

BUILDINGBETTER.TOGETHER. SUSTAINABLY. RESPONSIBLY.NEIL NETZERPresidentP 408.592.4034 nnetzer@elevatedcs.comFor more information about mass timber erection services:OFFICE4394 Enterprise Place Fremont, CA 94538P 510.270.4540info@elevatedcs.com