TMSERIES CG450INSTALLATION INSTRUCTIONSCOMMON STOREFRONT SYSTEM FIELD FAILURE PROBLEMS1. Failure to follow product installation instructions2. Poor workmanship3. Frames not installed level and plumb4. Frames not properly attached to resist dynamic forces of shear, tension and compression5. Leaks at sill ashing6. Debris left in glazing pockets7. Misapplication. For example, utilizing a storefront system for a curtain wall application8. Failure to install gaskets correctly and sealing corners9. Failure to install water diverters in ends of intermediate horizontals.10. Failure to install end dams at each end of sill ashing11. Glass not centered in opening and not using proper setting blocks.12. Not using anti-walk blocks to keep glass centered in pockets.Eective September, 2017 trulite.com Page 3STOREFRONT

Page 4

TMSERIES CG450INSTALLATION INSTRUCTIONSCG450 SCREW SPLINE FRAMING SYSTEM FOR ¼” GLAZINGTABLE OF CONTENTSINSTALLATION INSTRUCTION NOTES PART 1 Handling, Storage and Protection of Aluminum ............................................................................................................... 5 PART 2 General Installation Instructions ............................................................................................................................................. 5-6FRAME FABRICATION Typical Elevation Details and Glass Formula ....................................................................................................................................... 7 Determine Frame Size .............................................................................................................................................................................. 8 Fabricate Verticals and Pocket Fillers for Spline Screws ............................................................................................................... 9 Fabricate Head/Sill Member Anchor Holes ....................................................................................................................................... 10 Fabricate Intermediate Horizontals and Glass Stops ..................................................................................................................... 10 Fabricate Sill Flashing ................................................................................................................................................................................. 11 Fabricate Vertical Mullion for Steel Reinforcement ........................................................................................................................ 11FRAME ASSEMBLY Assemble for Exterior Glazing ............................................................................................................................................................... 12 Assemble for Interior Glazing .................................................................................................................................................................. 13 Assemble Sill Flashing with End Dams ................................................................................................................................................ 14FRAME INSTALLATION Install Sill Flashing ....................................................................................................................................................................................... 14 Install Sill Flashing at Doorjamb ............................................................................................................................................................. 15 Install Sill Flashing Splice Sleeve ............................................................................................................................................................ 15 Install Sill Flashing for Special Conditions .......................................................................................................................................... 16 Install/ Fabrication for Bulkhead in Sill Flashing.................................................................................................................................. 16 Install Head/Jamb Receptors and Shim Applications .................................................................................................................... 20 Install Assembled Panels in Opening .............................................................................................................................................. 21-22 Install Assembled Panel Sequence Options ....................................................................................................................................... 23 Apply Perimeter Sealant.............................................................................................................................................................................. 24GLAZING Glazing and Gasket Preparation Instructions .............................................................................................................................. 25-26 Installing Water Diverters ....................................................................................................................................................................... 27 Installing Glass Stops ................................................................................................................................................................................. 27 Installing Glass ........................................................................................................................................................................................... 28 Installing “W” Anti-Walk Blocks .............................................................................................................................................................. 29 Install Expansion Mullions .......................................................................................................................................................................... 17 Install Corners into Flashing ...................................................................................................................................................................... 18 Installing Optional Corners into Sill Flashing ..................................................................................................................................... 19 PARTS INDEX Parts/Accessories ................................................................................................................................................................................... 30-32Page 4 trulite.com Eective August, 2012

Page 5

TMSERIES CG450INSTALLATION INSTRUCTIONSEective September, 2017 trulite.com Page 5PART 1 - Handling, Storing and Protection of Aluminum A. PRECAUTIONS: The following precautions are recommended to protect architectural aluminum materials against damage. Following these precautions will help ensure early acceptance of your products and workmanship. B. HANDLE CAREFULLY: All aluminum materials stored at job site must be stored with adequate separation and not stacked directly onto the concrete oor slab to prevent materials from being damaged when handling. Cardboard wrapped or paper interleaved materials must be kept dry. C. CHECK ARRIVING MATERIALS: Check for quantity and keep records of where various materials are stored. D. KEEP MATERIAL AWAY FROM WATER, MUD AND SPRAY: Prevent cement, plaster or other materials from damaging the nish. E. PROTECT MATERIALS AFTER ERECTION: Wrap aluminum section proles with polyethylene or protect by erecting a polyethylene splatter screen. Cement, plaster, terrazzo, other alkaline solutions and acid based materials used to clean masonry are very harmful to the nish and should be removed with water and mild soap IMMEDIATELY. Reference AAMA 609 and 610-2 for cleaning architectural aluminum.PART 2 - General Installation Instructions A. CHECK SHOP DRAWINGS, INSTALLATION INSTRUCTIONS AND GLAZING INSTRUCTIONS to become thoroughly familiar with the project. The SHOP DRAWINGS take precedence and include specic details for the project. The INSTALLATION INSTRUCTIONS are of general nature and cover most common conditions. B. CUTTING TOLERANCES: Fabrication cutting tolerances are +0”/-1/32” unless otherwise noted. C. ERECTION: All materials are to be installed plumb, level and true. D. BENCH MARKS: All work should start from bench marks and/or column lines established by the ARCHITECTURAL DRAWINGS and the GENERAL CONTRACTOR with guaranteed accuracy. Check mullion spacing from both ends of masonry opening to prevent dimensional build-up of daylight opening. E. SURROUNDING CONDITIONS: Make certain construction which will receive your materials is in accordance with the contract documents. Notify the general contractor in writing of any discrepancies and resolve dierences before proceeding with work. F. ISOLATION OF ALUMINUM: Aluminum to be placed in direct contact with uncured masonry, pressure treated wood or incompatible materials should be isolated with a heavy coat of zinc chromate or bituminous paint. G. SEALANTS: Sealants must be compatible with all materials which they have contact, including other sealant surfaces. Consult with sealant manufacturer for recommendations relative to joint size, shelf life, compatibility, cleaning/priming, tooling, adhesion, etc. It is the responsibility of the GLAZING CONTRACTOR to submit a statement from the sealant manufacturer indicating that glass and glazing materials have been tested for compatibility and adhesion with glazing sealants, and interpreting test results relative to material performance, including recom- mendations for primers and substrate preparation required to obtain adhesion. The chemical compatibility of all glazing materials and framing sealants with each other and with like materials used in glass fabrication must be established. This is required on every project. H. FASTENING: Within the body of these instructions, “fastening” means any method of securing one part to another or to adjacent materials. Only those fasteners used within the system are specied in these instructions. Due to various substrates to which the framing may be attached, structural perimeter anchor fasteners are not specied in these instructions. For structural perimeter fasteners, reference the shop drawings, structural anchor charts or consult with the fastener supplier.

Page 6

TMSERIES CG450INSTALLATION INSTRUCTIONS I. BUILDING CODES: Glass and glazing codes governing the design and use of products vary widely throughout the USA. Trulite does not control the selection of product congurations, operating hardware, or glazing materials, and assumes no responsibility for these design considerations. It is the responsibility of the owner, specier, architect, general contractor and installer to make these selections in strict conformance with all applicable codes. J. EXPANSION JOINTS: Expansion joints and perimeter seals shown in these instructions and in the shop drawings are shown at normal size. Actual dimensions may vary due to perimeter conditions and dierences in metal temperature between time of fabrication and the time of installation. Detailed instructions and formula used to calculate expansion joints are shown within the body of these instructions. K. FIELD TESTING: It is recommended that AAMA 501.2 Water Hose Test be conducted once a sucient portion of the framing is installed, glazed and sealed to ensure proper installation. This test should be repeated on large projects at specic intervals as deemed necessary by job conditions and acceptable quality control standards. L. COORDINATION WITH OTHER TRADES: Coordinate with the GENERAL CONTRACTOR and sequence with other trades any materials which oset your framing installation. For example, backup walls, partitions, ceilings, mechanical ducts, convectors, etc. M. FINAL CLEANING (CARE AND MAINTENANCE): Final cleaning of exposed aluminum surfaces should be done in accordance with AAMA publications 609.1 for anodized aluminum and 610.1 for applied painted coatings (liquid or powder). N. PRODUCT DESIGN CHANGES: Trulite reserves the right to change product designs without prior notice when deemed necessary for product improvement. Please check our website at www.trulite.com for the latest product installation instructions prior to commencing work.NOTE: SERIES CG450 FRAMING SYSTEM WAS TESTED USING DOW 995 SEALANT FOR ALL INTERNAL SEALS AND DOW 795 SEALANT FOR EXTERIOR PERIMETER SEALS. THROUGHOUT INSTALLATION INSTRUCTIONS “SEALANT” IS USED AS A GENERIC TERM. REFERENCE: PART 2 - GENERAL INSTALLATION INSTRUCTIONS - G REGARDING SEALANTS.TRULITE ABBREVIATIONS USED IN THESE INSTRUCTIONS: D.L.O. = Day Light Opening  = Diameter Typ. = Typical Page 6 trulite.com Eective September, 2017

Page 7

TMSERIES CG450INSTALLATION INSTRUCTIONSCG450-1CG450-181¾”¼”4½”CG450-3CG450-361¾”1¾””CG450-3 CG450-41¾”CG450-11CG450-3CG450-361¾”CG450-4 CG450-31¾”4½”1¾”CG450-1CG450-5RG-1CG450-12 (Typ.)ST450-4 OptionalInterior GlazeExterior GlazeCG450-8 CG450-91¾”1 1A2 3 45A5671 2 3 45671¾”CG450-7CG450-5CG450-11¾”4½”¼”CG450-18TYPICAL DETAILS AND ELEVATION: 1¾” x 4½”5OptionalCG450-111¾”¼”D.L.O.1¾”Glass FormulaD.L.O.D.L.O.1¾”¼”D.L.O. = Daylight OpeningINTERIORMASONRY OPENINGNET FRAME HEIGHTD.L.O.D.L.O.JAMB VERTICALHEADHORIZONTALSILLVERTICAL VERTICALSill FlashingD.L.O.D.L.O.”CG450-12”¼”1CG450-111¾”¼”AJAMB5671AAA6A7AEXTERIOREective September, 2017 trulite.com Page 7

Page 8

SERIES CG450INSTALLATION INSTRUCTIONSTMMeasure width of masonry opening at the top, middle and bottom as shown in FIG. 1.*Sill Flashing Length = Smallest dimension minus (-) 1/2”.NOTE: 1/4“ caulk joint is minimum that should be used. (3/8” to 1/2“ is acceptable).Measure height of masonry opening in several places. See FIG. 2*Frame Height = Smallest dimension minus (-) 5/8”.1/4” shim/caulk at head1/8” for CG450-12 sill ashing1/4” shim/caulk below sill ashingNOTE: 1/4“ caulk joint is minimum that should be used. (3/8” to 1/2“ is acceptable.MEASUREMEASUREMEASURE¼”¼”MEASUREMEASUREMEASURE¼”3⁄8”FRAME HEIGHT:FIG. 1FIG. 2*MASONRY OPENING*SILL FLASHING LENGTH*FRAME HEIGHT*MASONRY OPENING3⁄8”3⁄8”*NET FRAME WIDTHFRAME FABRICATIONSTEP 1.DETERMINE NET FRAME WIDTH AND HEIGHT BY MEASURING MASONRY OPENING:FRAME WIDTH:Measure width of masonry opening at the top, middle and bottom as shown in FIG. 1. *Sill Flashing Length = Smallest dimension minus (-) 1/2" Note: 1/4" caulk joint is minimum that should be used. 3/8" to 1/2" is acceptable.FRAME HEIGHT:Measure height of masonry opening in several places. See FIG. 2. *Frame Height = Smallest dimension minus (-) 5/8". 1/4” shim/caulk at head 1/8 for CG450-12 sill ashing 1/4” shim/caulk below sill ashing Note: 1/4" caulk joint is minimum that should be used. 3/8" to 1/2" is acceptable.Page 8 trulite.com Eective September, 2017

Page 9

TMSERIES CG450INSTALLATION INSTRUCTIONSFRAME FABRICATIONSTEP 2.FABRICATE OPEN BACK VERTICALS AND SNAP-IN FILLERSCut vertical members to net frame height.Drill or punch 0 .257 holes (letter “F” drill) in vertical members for spline screw FAS 14-2 (#1/4-14 x 1” HH tapping screw) using drill jig DJ450-36(FIG.3) or Trulite punch die (CG450) and Time Fabsaver™ punch press.Reference FIGS. 4 and 5 for using DJ450-36 symmetrical drill jig.Align DJ450-36 at top, bottom, horizontal locations on vertical members and drill holes as shown.DJ450-36 Drill JigUse Letter "F" (.257Ø) Drill⁄”FIG. 3FIG. 4 Exterior Glazing FIG. 5 Interior Glazing verticalmullionllerCG450-11CG450-36HEADERHORIZONTALCG450-2SILL⁄”1 ½”1 ¼”¼”2 ⁄” ½” ½”1 ¼”¼” ½” ½”1 ¼”¼”½”1 ¼”¼”DJ450-36DJ450-36CG450-11CG450-36HEADERHORIZONTALCG450-4SILLCG450-4CG450-36HEADERHORIZONTALCG450-11SILLBOTTOM OF VERTICALTOP OF HORIZONTALTOP OF VERTICALBOTTOM OF VERTICALTOP OF HORIZONTALTOP OF VERTICALDJ450-36DJ450-36DJ450-36DJ450-36DJ450-36½”1 ¼”¼”1 ¼”¼”Eective September, 2017 trulite.com Page 9

Page 10

SERIES CG450INSTALLATION INSTRUCTIONSTMFIG. 7HEAD/SILLClear hole for Ø 1/4" fastener2”2”Drill & Countersink for HEADCG450-1CG450-18 (required)at head fastenerWALL JAMBCG450-12"2"Clear hole for Ø 1/4" fastenerCG450-11 CG450-4FIG. 6FIG. 6A*CG450-11CG450-18* Preferred for high performance.NOTE: Do not locate anchor holes at intermediate horizontal locations. Position these holes just above or below horizontal location.MULLION LENGTHNOTE: CG450-18 at ller must be used for attaching CG450-1 to substrate.Cut and install 4” long pieces of CG450-18 at all anchor locations.Drill & Countersink for at head fastenerSee engineering calculations for locations xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxFRAME FABRICATIONSTEP 3CUT HORIZONTAL PROFILES TO D.L.O. CUT GLASS STOPS D.L.O. MINUS (-) 1/32” Fabricate head, sill and wall jamb anchor holes as shown in FIG. 6, FIG 6A and FIG. 7. Reference anchor chart for quantity, size and location for each substrate. The rst hole is always 2” from each end. Spacing between any additional fasteners vary based on substrate material and engineering calculations.Page 10 trulite.com Eective September, 2017

Page 11

TMSERIES CG450INSTALLATION INSTRUCTIONSSTEP 4.FABRICATE SILL FLASHING:CUT SILL FLASHING CG450-12 (Reference FIG. 1 for cut length) FIG. 13 for structural fastener attachment. Holes may be staggered as required.CG450-1224”24”Mid-pointDrill 3/16” Ø holes and countersink for non-structural anchorsStep 5. FABRICATE STEEL REINFORCEMENT WHERE REQUIRED.ST450-4CLCLFAS8-6Start at center and attachsteel to mullion at 12” on center.Drill and countersink hole asshown for (#8-32 x 3/8” FHP “F”)FIG. 8FIG. 9FIG. 102 ” Fabricate sill ashing non-structural anchor holes as shown in FIG. 8. Hole locations shown are approximate. Reference anchor chart quantity, size and location for each substrate. Use “V” grooves for non-structural anchors. Reference Step 7, ( Reference FIGS. 9 & 10)MULLION LENGTH1”4 ”“V” Groove“V” Groove“V” GrooveSTEP 4 FABRICATE SILL FLASHING:CUT SILL FLASHING CG450-12 (Reference FIG.1 for cut length) Fabricate sill ashing non-structural anchor holes as shown in FIG. 8. Hole locations shown are approximate. Reference anchor chart quantity, size and location for each substrate. Use “V” grooves for non-structural anchors. Reference Step 7, FIG. 13 for structural fastener attachment. Holes may be staggered as required.Eective September, 2017 trulite.com Page 11

Page 12

SERIES CG450INSTALLATION INSTRUCTIONSTMFRAME ASSEMBLY - EXTERIOR GLAZEDSTEP 6.APPLY GT1 TACKY TAPE AT ALL HORIZONTAL TO VERTICAL JOINTSNote critical seal area shown in FIG. 11.CRITICAL SEAL: Clean, prep and completely ll gasket reglet with sealant at bottom of vertical and pocket ller as shown. FAS14-2TypicalSpline ScrewCG450-1GT-1CG450-1/CG450-11CG450-5CG450-4CG450-361¾”FIG. 11GT-1 Tacky Tape1/4” Ø anchor holes at head and sillReference Step 3, FIG. 6CG450-3Page 12 trulite.com Eective September, 2017

Page 13

TMSERIES CG450INSTALLATION INSTRUCTIONSFRAME ASSEMBLY - INTERIOR GLAZEDSTEP 6.APPLY GT1 TACKY TAPE AT ALL HORIZONTAL TO VERTICAL JOINTSNote critical seal area shown in FIG. 12.CRITICAL SEAL sealant at horizontal joints to vertical FAS14-2TypicalSpline ScrewCG450-1GT-1CG450-4CG450-5CG450-11CG450-361¾” FIG. 12CG450-3GT-1 Tacky TapeEective September, 2017 trulite.com Page 13

Page 14

SERIES CG450INSTALLATION INSTRUCTIONSTMFRAME ASSEMBLY STEP 7.INSTALL SILL FLASHINGApply GT-1 tacky tape to ED450-1 end dam(s) and attach to sill ashing as shown in FIG. 13Center sill ashing into opening allowing for a 1/4” minimum shim space at each end. Shim beneath sill ashing and attach sill ashing. Wedge shims tightly behind end dams at wall jambs and seal as shown in FIG. 14. Run a continuous bead of sealant along the entire length of the sill ashing’s “C” slot just prior to installing frame panels.GT-1ED450-1CG450-12CG450-12ED450-11/4” ShimSubstrate at wall conditionSeal and toolFill “C” slot with sealant just prior to installing panels.Attach with non-structuralfasteners and cap seal.FIG. 13FIG. 141/4” ShimApply bead of silicone front to back just prior to installing panelsPage 14 trulite.com Eective September, 2017

Page 15

TMSERIES CG450INSTALLATION INSTRUCTIONSSplices should be located every 12 to 15 feet with a 1/2” expansion joint as shown in FIG. 16. ½” MinimumEmbed SV450-12 Splice SleevesealantSeal entire length of splice sleeveApply bond breaker tape to one side of sleeve toavoid 3 side adhesion.SILL FLASHING SPLICEFIG. 1640290 Threshold is anchoredto nished oor. Reference doorand doorframe instructions.Door jamb at sideliteThoroughly seal tosubstrate and ashingCG450-12Sill FlashingShim SILL FLASHING AT DOOR JAMBFIG. 15Door jamb rests on nished oorInstall doorframe in opening rst. Install sill ashing so that it abuts tightly against door jamb. Shim, level and attach tosubstrate with non-structural fasteners. Cap seal fasteners and apply sealant at inside of doorjamb and ashing as shownin FIG. 15.NOTE: Do not apply perimeter sealant at this time. Perimeter sealant is not applied until all panels have been installed and attached to masonry opening.Eective September, 2017 trulite.com Page 15STEP 7A.OPTIONAL IF REQUIREDSTEP 7B.

Page 16

SERIES CG450INSTALLATION INSTRUCTIONSTMCompletely seal corner and cap seal anchors with sealantHard pin anchor at cornersCG450-12 12”18”3”18”CLSpliceFIG. 17FIG. 18CG450-1 used for alignment onlyCG450-18 Pocket FillerCG450-126”6”Center3”D.L.O.3”CG450-25CG450-3CG450-15CG450-12RG-1RSB-1VAR3/16"Miter cut two 18” sections of sill ashing to correct angle as shown in FIG. 17. Drill two anchor holes located in each section as shown to hard pin sill ashing. Shim and anchor with 3/16” non-structural fastener and cap seal. Completely seal mitered corners. NOTE: This procedure is required for mitered corners.Anchoring CG451-17Cut CG450-18 at ller D.L.O. minus (-) 6”. Drill (3) 1/4”  holes as shown in FIG. 18. Use short piece of CG450-1 to properly align CG-450-18 at ller to CG450-12. Anchor with (3) 1/4”  2" non-structural fastener and cap seal with silicone sealant. CG450-25 bulkhead snap ts onto CG450-18.Page 16 trulite.com Eective September, 2017STEP 7C.

Page 17

TMSERIES CG450INSTALLATION INSTRUCTIONSEective September, 2017 trulite.com Page 17EXPANSION MULLION INSTALLATION PROCEDURE CG450-8CG450-9CG450-12*Calculated GapStep 15.*Determined by job conditions, project specications and temperature at time of installation. Expansion mullions allow for 3/8” maximum movement. Reference Fig. 19EXPANSION GAP SIZE FORMULA = LENGTH (”) X F° (Fahrenheit) DIFFERENCE X .0000129 L = Length in inches between centerline of expansion mullion in elevation. F° = Specied temperature variation .0000129 = Thermal coecient for aluminumEXAMPLE:Assume 100° temperature variation specied and temperature at job site on day of installation is 60°. 1. 100° - 60° = 40° temperature dierence 2. Length of elevation between expansion mullions equals 20’-0” or 240” 3. 240” x .0000129 x 40° = .124”. Therefore, set expansion gap at .124 or 1/8”.FIG. 19RG-11STEP 7D.*Determined by job conditions, project specications and temperature at the time of installation. Expansionmullions allow for 3/8” maximum movement. Reference FIG. 19EXPANSION GAP SIZE FORMULA = LENGTH (“) X F° DIFFERENCE X 0.0000129L= Length in inches between centerline of expansion mullion in elevationF= Specied temperature variation (Degrees Farenheit)0.0000129= Thermal coecient for aluminumEXAMPLE:Assume 100° temperature variation specied and temperature at job site on day of installation is 60°. 1. 100° - 60° = 40° temperature dierence 2. Length of elevation between expansion mullions equals 20’ - 0” or 240” 3. 240” x. 0.0000129 x 40° = 0.124”. Therefore, set expansion gap at 0.124 or 1/8”.

Page 18

SERIES CG450INSTALLATION INSTRUCTIONSTMPage 18 trulite.com Eective September, 2017FIG. 20FIG. 21CG450-14 Corner PostCG450-4 SillCG450-12 FlashingCG450-15 Corner Trim Sealant TypicalINSTALLATION OF OPTIONAL CORNERSSTEP 8. Attach horizontal members to one side and anchor head and sill as shown in FIG 20. Install horizontals to other side and anchor head and sill.Install corner trim as shown in FIG. 21

Page 19

TMSERIES CG450INSTALLATION INSTRUCTIONSCG450-9CG450-9CG450-121/8” Aluminum Brake Metal Typ.CG450-9Seal all voids with sealant (Typ.) where shown1/8” AluminumBrake Metal Typ.CG450-12VariesVariesCG450-12VariesINSTALLATION OF OPTIONAL CORNERSFabricate female half of expansion mullion used for optional adjustable corners in same manner as for standard mullion.Eective September, 2017 trulite.com Page 19

Page 20

TMSERIES CG450INSTALLATION INSTRUCTIONSPage 20 trulite.com Eective September, 2017INSTALLATIONHEAD RECEPTOR SPLICE JOINTCut SV450-1 splice sleeve to t and embed in sealant. Fill voids with sealant and tool.JAMB RECEPTOR AT SILL FLASHINGSHIM INSTALLATION (shims are furnished by installer) Install shims at head, sill ashing and jamb at anchor attachment location.CS450-1SV450-1Completely seal CG450-12 and CG450-27 at joinery with sealant as shown Flat hear perimeter fastenerHorseshoe shim1/2”MinimumCG450-18 Filler PlateClear hole in at llerRG-11CG450-27CG450-26CG450-12CLSealant

Page 21

TMSERIES CG450INSTALLATION INSTRUCTIONSCG450-11OptionalCG450-1EXTERIOR GLAZED INTERIOR GLAZEDCG450-4Sealant in anchorhole prior to fastening and cap sealCG450-11CG450-4CG450-18FIG. 22CG450-12FIG. 23Cap seal (Typical)CG450-12FIG. 24Using CG-450-28 Sill Flashing: - The use of CG450-28 eliminates the labor required to drill the concrete a second time.- Just prior to installing the frame sections apply a continuous bead of sealant lling the “c” slot at the top of the sill ashing to compelete the installation.- For conditions where the end load reaction is greater than 500# it is necessary to anchor the sill member to the ashing.CG450-4CG450-28SealantCG450-4CG450-28INSTALLATIONSTEP 9.Install rst panel on left end, plumb, level and place 1/4” shim tightly between end dam and wall jamb. See FIG. 14page 14. Match drill holes located in sill through and into ashing substrate. Clean debris and insert sealant into holes prior to attaching structural fasteners. See FIGS. 22 and 23. Match drill anchor holes in head prole into substrate. Apply sealant to "c" slot in sill ashing. See FIG. 14 page 14. With the rst panel installed and attached to substrate; continue installing panels as illustrated on page 22. Once all panels have been installed and securely anchored, cap seal all structural fasteners.NOTE: Ensure panels are pushed tight against sill ashing and level before attaching. See FIG. 25.Eective September, 2017 trulite.com Page 21

Page 22

TMSERIES CG450INSTALLATION INSTRUCTIONSPage 22 trulite.com Eective September, 2017NOTE: Apply perimeter sealant at exterior and interior after all panels have been installed and anchored to substrate.Anchor jambs to substrate when required. Reference shop drawings and/or anchor charts. After all panels have been anchored, apply perimeter seal on exterior and interior. See FIG. 30 for weeps at ashing on page 24.Perimeter Seal attaching.CG450-1CG450-18CG450-11OptionalFIG. 25FIG. 26

Page 23

TMSERIES CG450INSTALLATION INSTRUCTIONSINSTALLATIONSTEP 10. deep pocket for glazing. Two shallow pockets should never be facing each other. Expansion mullions should be used in elevations exceeding 24 feet in length to allow for thermal movement. See FIG. 19 Page 16.INTERMEDIATE PANEL SEQUENCELAST PANEL SEQUENCEEXPANSION MULLION PANEL SEQUENCEFIG. 27FIG. 28FIG. 29INSTALLATIONSTEP 10.Frames can be shop fabricated and assembled into panels for eld installation. Each panel must have at least one deep pocket for glazing. Two shallow pockets should never be facing each other. Expansion mullions shouldbe used in elevations exceeding 24 feet in length to allow for thermal movement. See FIG. 19 Page 17.Install shim as required.Eective September, 2017 trulite.com Page 23

Page 24

SERIES CG450INSTALLATION INSTRUCTIONSTMPage 24 trulite.com Eective September, 20171111 1PERIMETER SEALANTFIG. 30CG450-3CG450-41/2” to 3/4” weep gaps in sealantat overlap onto vertical mullionsSurroundPerimeterSealantStep 18. Apply perimeter sealant.½”DETAIL “A” it overlaps onto vertical mullion as noted by symbol.1A1CG450-12STEP 11.APPLY PERIMETER SEALANT.Apply sealant as shown. Seal across intersection between sill and sill ashing. Leave approximately ½" to ¾" gap in sealant for weepage where it overlaps onto vertical mullion as noted by symbol.1

Page 25

TMSERIES CG450INSTALLATION INSTRUCTIONSIt is important that gaskets are cut and installed as shown in FIG. 33.1/4 1/41/26" minimumEdge of glass4” long setting blockminimumSetting block (2) per liteStart head and jamb gaskets at center and cornersStart sill gaskets at setting blocksGLASS SIZE = DAYLIGHT OPENING (D.L.O.) + 5/8”D.L.O.D.L.O.FIG. 31FIG. 32FIG. 33 Reference Dead Load Charts for intermdiate horizontalFour gaskets are cut 3/16” longer per foot than D.L.O. (width and height; Ref. FIG. 29) to allow for shrinkage.GLAZINGSTEP 12.REMOVE ALL TRASH FROM GLAZING POCKETS AND REGLETS.Set glass on two (2) identical setting blocks positioned at 1/4 points in opening. Reference Dead Load Charts for locations on intermediate horizontal. Setting blocks are not to be placed closer than 6” from the edge of glass.GLASS SIZE = DAYLIGHT OPENING (D.L.O.) + 5/8”Reference Dead Load Charts for intermediate horizontalFour gaskets are cut 3/16” longer per foot than D.L.O. (width and height; Ref. FIG. 31) to allow for shrinkage.It is important that gaskets are cut and installed as shown in FIG. 33.Eective September, 2017 trulite.com Page 25

Page 26

TMSERIES CG450INSTALLATION INSTRUCTIONSPage 26 trulite.com Eective September, 2017GLAZING GASKETS FOR STOREFRONT SYSTEMSCORNER TREATMENTSGlazing gaskets are prone to shrink and pull away at the corners over a period of time. This allows for excessive air and/or water inltration at the corners. Standard glazing practice is to provide corner treatment to ensure weather tightness on the exterior and interior corner intersections.NOT RECOMMENDEDNotch Cutting Corners- The corners of the rubber gasket are notched on the underside without cutting the nearside. The gasket is installed in one length and is butt joined in the center at the horizontal or header. While this method of glazing is widely used for marine glazing residential sliding glass doors or shower doors, it is not recommended for commercial storefront glazing.RECOMMENDEDSEALED CORNERSPull gaskets back 2” in both directions from interior and exterior corners as shown in FIG. 34 and seal with sealant. This should be done on exterior and interior for best performance. While long term adhesion to the rubber gaskets with sealant is not assured, historical eld experience has proven this type corner treatment to be the next best method short of vulcanized corner gaskets. Apply sealant2” back from each cornerCorner Notching-Not RecommendedFIG. 34SEAL CORNERSInterior2”2”

Page 27

TMSERIES CG450INSTALLATION INSTRUCTIONSEective September, 2017 trulite.com Page 27STEP 20. Install WD450-1 bottom lite of glass has been installed. Repeat process for each subsequent intermediate horizontal. Embed water deectors in bed of DOW 795 sealant. See FIG. 34. FIG. 36CG450-3CG450-3CG450-3SealantEXTERIOR GLAZED INTERIOR GLAZEDNote:Verticalomitted forclarity1Embed WD450-1 in sealant as shownFIG. 35WD450-1WD450-1 Item Sill Member Intermediate Horizontal Sidelite Base Glass Size 26015, 26599, 26600 OutsideGlazedInteriorGlazedSystemsCG450 &CS450RSB-1RSB-1Setting BlockRSB-1RSB-2Setting Block¼”¼”¼” Spacer1” Spacer¼” Spacer1” SpacerSTEP 13.Install WD450-1 water deectors at each end of intermediate horizontals during sequential glazing process after the bottom lite of glass has been installed. Repeat process for each subsequent intermediate horizontal. Embed water deectors in bed of sealant. See FIG. 35.STEP 14. Install snap-in glass stops. Apply sealant to ends of glass stops for interior glazing only.Install remaining glazing gaskets.

Page 28

TMSERIES CG450INSTALLATION INSTRUCTIONSEective September, 2017 trulite.com Page 28EXTERIOR GLASS INSTALLATIONStep 19. EXTERIOR or INTERIOR GLAZING: Place setting blocks at 1/4 points or 1/8 points or as required. INSTALL GLASS: Use 4 step method for either exterior FIG. 32 or interior FIG. 33 glazing beginning with bottom lites and working toward top.12431243FIG. 37FIG. 38INTERIOR GLAZINGEXTERIOR GLAZING5EXTERIOR GLASS INSTALLATIONSTEP 15.EXTERIOR GLAZING:Install interior glazing gaskets to create a tight t at corners.Place setting blocks at 1/4 points or 1/8 points or as required.INTERIOR GLAZING:Install exterior glazing gaskets to create a tight t at corners.Place setting blocks at 1/4 points or 1/8 points or as required.INSTALL GLASS:Use methods below for glazing. For exterior FIG. 37 or interior FIG. 38 glazing begins with bottom lites and works toward top.

Page 29

TMSERIES CG450INSTALLATION INSTRUCTIONSEective September, 2017 trulite.com Page 29FIG. 39Flatten “W” block. Slide between reglet and glass into pocketbehind glass.RW450-1Anti-walk “W” blockSTEP 16.Anti-walk blocks (“W” blocks) prevent the glass from “walking” or shifting from the shallow pocket into the deep pocket. Install one RW450-1 “W” anti-walk block into the deep glass pocket at the approximate center of the glass opening as shown in FIG. 39. STEP 17.Exterior Glazed: Install and seal corners of exterior gasket in accordance with Step 12, page 25.Interior Glazed: Install and seal corners of interior gasket in accordance with Step 12, page 25.

Page 30

TMSERIES CG450INSTALLATION INSTRUCTIONSPage 30 trulite.com Eective September, 2017CG450PARTS INDEXHead/Jamb/Vertical MullionSill/HeadGlass StopVertical FillerIntermediate HorizontalHeavy Duty VerticalMale Expansion MullionCG450-124’5CG450-424’5CG450-324’12CG450-524’10CG450-3624’4CG450-724’5CG450-824’5DESCRIPTIONDESCRIPTIONPart No.LengthPcs./Box900 Corner Post - 1 Pocket900 Corner Post - 2 PocketCG450-1324’2CG450-1424’2900 Corner Post - CoverCG450-1524’2CG450-2524’1450/1350 Corner Post CG450-1624’2DESCRIPTIONFlat Filler PlateGlass Pocket FillerFemale Two Piece Head Receptor for CG450CG450-1824’10CG450-2124’12CG450-2624’6CG450-2724’6CG450-2824’6CG451-3824’6Sub-Sill Flashing(Use RG-11 gasket)(Use RG-11 gasket)One Piece Head Receptor for CG450 (Use RG-11 gasket)Male Two Piece Head Receptor for CG450Part No.LengthPcs./Box4½” x 4½”Horizontal use: CG450-13 Sill use: CG450-15CG450 FRAMING MEMBERS(Use RG-11 gasket)Part No.LengthPcs./BoxFemale Expansion MullionMullion Filler DP Pocket use with CG451-17Wall Jamb/ Head DP-PocketCG450-924’4CG450-1024’10CG450-1124’5Sill Flashing CG450-1224’10

Page 31

TMSERIES CG450INSTALLATION INSTRUCTIONSCS450PARTS INDEXDESCRIPTIONCS450 STACK FRAMING MEMBERSPart No.LengthPcs./BoxHead ChannelHead Filler Sill CanSill Can FillerVertical MullionIntermediate HorizontalUse CS450-7-1 shear block & CG450-5 Pocket FillerCS450-124’4CS450-224’4CS450-324’4CS450-424’4CS450-524’2CS450-624’4 Glass StopCG450-324’124⁄” x 1⁄” x 10 ga. GSMISCELLANEOUSDESCRIPTIONPart No.Use with CG450-1& DF450-8 ST450-4 Drill FixtureDJ450DJ450-36Eective September, 2017 trulite.com Page 31

Page 32

TMSERIES CG450INSTALLATION INSTRUCTIONSDESCRIPTIONAssembly Screw¼-14 x 1” HWH-F MS Part No.Pcs./Box PriceDESCRIPTIONSetting Block at transomPart No. Pcs./Box PriceWater DeectorUse at each end of Intermediate HorizontalAnti-Walk BlockSplice SleeveUsed with CS450-1Splice SleeveUsed with CG450-12End Dam at Sill FlashingUse at each end of CG450-12Bulb GasketUse with 4510, 4518& 44013GasketUse with CG450-8, CG450-26,CG450-27& CG450-38¼” Glass GasketUse with 26030 StopSetting Block*Reference ChartSetting Block*Reference ChartSetting Block*Reference ChartStandard Gasketfor ¼” Glazing.Wedge-In Interior & ExteriorStandard Gasket for ⁄” Glazing. Wedge-In Interior & ExteriorHeavy Gasket for ⁄” Glazing. Wedge-In Interior with RG-1 on the ExteriorACCESSORIES40.0015.0045.0036.0095.0080.00149.00130.0054.0046.00$40.0038.0028.0034.0034.0034.0033.00 46.00 ED450-1 50 FAS14-2 100 FAS10-11 100 GT-1 60’ RG-1 250’/Roll RG-2 250‘/Roll RG-3 250’/Roll 05212 500’/Roll RG-5 250‘/Roll RG-11 250’/Roll RSB-1 100 RSB-2 100 RSB-5 100 SV450-12 10 SV450-1 10 SV450-3 10 WD450-1 50 RW450-1 100 Splice SleeveUsed with CS450-3⁄” x ½” Joint Sealant TapeSpacerEach1.00Use with Sidelite Base members10 x ⁄” UC PFH Attach CG450-4 to CG450-284⁄” x 1⁄” x 10 ga. GSSTEEL REINFORCEMENTDESCRIPTIONPart No.Length PriceUse with CG450-1& DF450-8 ST450-4 12’-0“$215.00Drill FixtureDJ450DJ450-6For stack systemDJ450-361109.00DESCRIPTIONPart No.Pcs./Box PriceShear BlockUse with CS450-6Includes ScrewsShear ClipUse to attach 10220 to framejambEach$13.002.50 CS450-7-1 20 40134-01CS450 SHEAR BLOCKSDESCRIPTIONPart No.Pcs./Box PriceShear BlockUse with CG450-1Shear ClipUse with CG450-4Each$3.503.50 CS450-9 Each CS450-8CG450 SHEAR BLOCKSPage 32 trulite.com Eective September, 2017