Hp3 Price list - - Hp3 3ForewordPrice curriculum for service-related scaffolding work in Copenhagen and North Zealand's 1st and 2nd zones as a supplement to the 2025 collective agreement between DI DIO III and Fagligt Fælles Forbund Bygge- og Anlægsoverenskomst 2025.The collective agreement adjustment as of 1 March 2025 is incorporated in the following price curriculum, cf. the collective agreement renewal as of 1 March 2025.Price list valid as of 1 May 2025.All prices in this price list are increased by 2.7% as of 1 January 2026.An additional 2.5% will be added to all prices in this price curriculum as of 1 March 2027.March 2027.

Page 4

4 - Hp3 Price listContentsForeword 3General provisions 8Rules for piecework 8Local negotiations 9Specialised scaffolding 11Piecework requirements 11Price curriculum committee for service scaffolding work 12Structure of the price curriculum 13The 2-year scaffolding programme 14Training/mentoring allowance 16Training allowance rate 1 16Training allowance rate 2 16Mentoring allowance 16Assembly and disassembly of scaffolding 17General prerequisites 17A1 Erection, modification and dismantling 17A2 System scaffolding 17A3 Settlement for the completed scaffolding 17A4 Loading and unloading at the company's warehouse 17A5 Loading and unloading at the installation or dismantling site 17A6 Manual transport 17A7 Transport by forklift outside the company storage area 18A8 Transport under special conditions 18A9 Driving 18A10 Height allowance 18A11 Mounting tyres 19A12 Relocation 19A13 Dismantling 20

Page 5

Hp3 Price list - - Hp3 5A14Minimum price curve20A15Cleaning up20A16Roof allowance20A17Technical aids20A18Tenting21A19Minor challenges at the bottom22A20Module lengths22A21Handrails22A22Tyres22A23Box screen22A24Mesh and plastic23A25Electric hoist23A26Barrier equipment23A27Anti-theft protection23A28Tight cover23A29Fixings23A30Drilling holes24A31Reloading on site24A32Post-assembly24A33Assemblies24A34Cover lock for console25A35Tent labour prices25A36Pricing of pillars25Piecework prices 261Foot spindles and similar 262Facade frames 263Columns and pillars 264Horizontals (O/U), reinforced horizontals (O/U) and diagonals 26

Page 6

6 - Hp3 Price list5Temporary and permanent handrails and similar 266Consoles 287Aluminium/veneer tyres and aluminium/veneer walkway tyres 288Half-width steel deck/grating in system 309Trolleys 3010Stair treads, ladders and planks 3211Skirting boards 3212Screens and veneer sheets 3213Anchoring, eyebolts, drilling etc. 3414Pipes, couplings and consumables 3415Plastic (Reinforced plastic sheeting) 3616Netting 3617Electric hoist 3618Shaft 3619Trolleys, bridges and accessories for tents etc. 3620Barrier equipment 3821Other equipment 3822Tent surcharge 4023Roof surcharge 4024Moving the working deck 4025Mounting tyres 4026Height allowance (H) 4025 Start-up and transport surcharge (T) 40Supporting shapes 44Figure A1 - Tent surcharge 44Figure A2 - Tent supplement 45Figure A3 - Tent surcharge 46Figure A4 - Tent supplement 47Figure A5 - Tent supplement 48

Page 7

Hp3 Price list - - Hp3 7Figure B1 - Tent allowance building envelope 49Figure B2 - Tent allowance building envelope 50Figure B3 - Tent allowance building envelope 51Figure C1 - Horizontal transport 52Figure C2 - Horizontal transport 53Figure C3 - Horizontal transport 54Figure C4 - Horizontal transport 55Figure C5 - Horizontal transport 56Figure C6 - Horizontal transport 57Figure D1 - Roof extension 58Figure D2 - Roof extension 59Figure E1 - Height allowance 60Figure E2 - Height allowance 61

Page 8

8 - Hp3 Price listGeneral regulationsRules for pieceworkIn addition to sections 40, 45 and 48 of the Building and Construction Agreement, the following special rules apply to service-orientated scaffolding work.Claims for payment, cf. the section on "special scaffolding" and "piecework requirements" in the price list, must be stated by the labourer on the day sheet/day note for the day on which the work is performed.Physical daily reports with such requirements must be received by the employer no later than the following working day at the end of normal working hours.Digital daily reports with such claims must be transferred to the employer digitally no later than the following working day at the end of normal working hours.Physical piecework accounts must be received by the employer no later than the following working day at the end of normal working hours after the end of the piecework. For larger tasks/piecework accounts, the piecework accounts must be submitted no later than 3 working days after the end of the piecework.Digital piecework reports must be transferred to the employer no later than the following working day at the end of normal working hours. For larger tasks/piecework counts, digital piecework reports mustmust be transferred no later than 3 working days after the end of the piecework.If a physical claim is made, cf. the above, the employer must submit written criticism of the items and amounts that cannot be approved no later than three working days after the daily list or piecework accounts have been verifiably received. The day of receipt does not count towards the deadline for criticism.If claims are made digitally, cf. the above, the employer must submit written criticism of the items and amounts that cannot be approved no later than 3 working days after the daily/ piecework reports have been verifiably transferred. The digital transfer day does not count towards the deadline for criticism.In the case of digital reporting, the employees/shift must follow up on any criticism in the reported system.If the above deadlines are not met, the submitted demands or offers are considered approved.For piecework pricing for scaffolding types that are not priced in this price catalogue, please refer to the price catalogue's section on special scaffolding.For piecework pricing for individual parts or work not listed in this price list, please refer to the price list's section on special scaffolding,please refer to the section on "Piecework requirements" in the price catalogue.The above is agreed before the work is carried out, and if this has not been done or agreement has not been reached, the work will be carried out at an hourly rate. Disagreements

Page 9

Hp3 Price list - - Hp3 9shall be dealt with according to the rules in the Rules for handling industrial disputes.However, not by industrial arbitration, unless the organisations (DI DIO III and 3F) agree otherwise.All transport to and from the workplace as well as loading and unloading are included in the piecework rates.If the assumptions for piecework prices change significantly, negotiations must be entered into to change the basis for payment - possibly with the involvement of the organisations.The physical daily note or the digital daily report reflects agreements on claims for payment of special scaffolding, see the price currant's section on "special scaffolding" and claims raised, see the price currant's section on "piecework claims".The digital daily report must be able to be reported without the report being split into several systems.It must be possible to report the digital piecework report without splitting the report into several systems.Digital daily and piecework reports can be reported in separate systems.It must be possible to print out digital reports and criticism and/or send them as a document, e.g. PDF via email.The company must provide the necessary equipment for the digital reporting.digital reporting.The individual employee is not entitled to personal equipment for digital reporting.The company is responsible for instructing employees in the use of digital reporting systems.Local negotiationsIn addition to the Building and Construction Agreement's rules for handling industrial disputes, the following applies and must be carried out in the event of local disagreements:-Firstly, it is assumed that each shift will hand in a physical day sheet or physical piecework accounts each day, labelled with the date the work was carried out. The employer shall acknowledge receipt of the daily/ piecework accounts immediately upon receipt. The union is entitled to a copy of the submitted daily/ piecework accounts, where the employer's or his representative's acknowledgement of receipt appears.-Initially, it is assumed that each shift has transferred a digital day or piecework report with the date the work was performed. The content of the digital daily or piecework report showing the date of transfer must be printable in a readable physical format.-The employer shall submit written criticism of the physical daily report/ piecework accounts or, in the case of digital reporting, the daily report/ piecework report

Page 10

10 - Hp3 Price listno later than three working days after receipt or transfer of the physical or digital report. The written criticism of the items and amounts that cannot be approved must be printable in a legible physical format that also shows the date of the criticism raised.-If disagreements are found, e.g. regarding payment for other work directly related to the piecework, a negotiation must take place within three working days of the criticism being raised between the union and the employer or his representative.-If no agreement is reached, negotiations shall be held between the employer or its representative and the employees through their representative. These negotiations must be concluded within 10 working days of the employer or its representative's submission of written criticism. If a shop steward has been elected at the company, he or she shall be involved in the negotiations.-In cases where the shop steward, at the request of the company, participates in local negotiations of disagreements at workplaces other than the one where the shop steward is employed, thethe union representative is employed, the employer shall reimburse the union representative for loss of earnings.-If no agreement is reached, the parties are obliged to formulate in writing on the one hand the claim and the reasons for it and on the other hand to justify the criticism.-The matter can then be referred tolocal negotiations between 3F Copenhagen and the company on the basis of the written material. The parties may request an inspection of the work carried out if this is deemed necessary. If no agreement is reached locally in such negotiations, the matter may be pursued through labour law.-Neither of the organisations shall be precluded from at any time raising other matters in accordance with the provisions of the agreement.-The parties further agree that the commencement of industrial action will presuppose a written record of the local negotiations setting out both parties' position on the disagreement.-The parties are bound by this written requirement and may at the same time unilaterally require their own views to be stated. The minutes of the local negotiation shall be signed by both parties at the end and a copy shall be given to each party.-When requesting a mediation meeting, it is agreed between the organisations that the complaining party is obliged to submit written minutes of the local negotiation, signed by the parties involved, together with the mediation request.-After the mediation meeting, one of the organisations may request the dispute to be dealt with by the Price List Committee before the case is taken further in industrial law.Disagreements about piecework terms may be dealt with in accordance with the rules for dealing with industrial disputes.

Page 11

Hp3 Price list - - Hp3 11However, not by industrial arbitration, unless the organisations (DI DIO III and 3F) agree.Specialised scaffoldingAssembly of special scaffolding not covered by piecework in the price list must be paid for separately in accordance with the provisions of the price list for service-related scaffolding work on "Payment requirements".Agreements on performance and settlement of the work must be agreed in writing and signed by the parties before the work is commenced.If no agreement can be reached on the piecework terms, the work shall be performed at hourly wages.Disagreements on piecework terms may be dealt with in accordance with the rules for handling industrial disputes.However, not by industrial arbitration, unless the organisations (DI DIO III and 3F) agree otherwise.Piecework requirementsClaims for payment for assembly, relocation or disassembly of equipment or the performance of work that is not priced in the price list must be made as soon as possible during the course of the work.When a representative of the employees submits a claim for piecework to the enterprise or its representative, the enterprise must respond as soon as possible.When the company has submitted its offer, the employees must respond as soon as possible.Demands and offers must be based onbe based on already priced material or work and must not be obstructed by seeking disagreement.If agreement cannot be reached, the unpriced work in question shall be carried out at hourly wages.The above requirements for payment for unpriced work must be stated on the daily schedule and follow the time limits for criticism described for the other elements on the daily schedule.The day sheet must be submitted no later than the following working day before the end of normal working hours.If the stated deadlines for submission of the daily schedule or criticism are not met, the submitted requirements or offers will be considered accepted.Disagreements are handled according to the rules in the Rules for Handling Labour Disputes.However, a disagreement must be submitted for consideration by the price curve committee if one party so requests,before the matter is referred to arbitration.

Page 12

12 - Hp3 Price listPrice curve committee for service-oriented scaffolding workThe parties have set up a joint price curriculum committee with up to 7 participants from each side appointed by the organisations to work on setting prices for work with new or changed materials and changes in pricing, applicable to the price curriculum for service-related scaffolding work for Copenhagen and North Zealand's first and2. zone and in the provinces.The committee must also deal with issues in connection with changed working conditions, preconditions, or changed working procedures/conditions due to changed working environment requirements, and be consulted in disputes regarding the understanding, application and piecework terms of price scales.The Price Curriculum Committee assists the Training Committee in determining the framework for agreements on the training of fitters in the 2-year scaffolding training programme.If the parties agree to set or change prices for such work, theseprices for such work, these prices shall apply until they are cancelled by one of the parties at the expiry of the agreement. Agreement on the fixing of prices for such work is part of the collective agreement.The prices shall be printed as a protocol/addendum and entered in the white paper to the price lists mentioned in the current period and included in the printed price lists in the followingcollective agreement period.The committee shall - based on one meeting per quarter-its own meeting schedule and themes/topics. Minutes are prepared at the meetings, d e s c r i b i n g what has been discussed and what the parties' positions/proposals and recommendations have been from the committee meetings. The minutes are reviewed and sent before the end of the meeting.In addition, the committee meets when one of the parties so wishes. The committee meets within 15 working days, unless otherwise agreed.If a dispute concerning the basis and terms of the piecework agreement is discussed, the committee must complete its work as soon as possible and within two months at the latest, unless otherwise agreed between the parties.If the price curtailment committee fails to reach agreement on the fixing of prices, the matter shall be dealt with in accordance with the rules of industrial law.Only agreement in the committee is final and the case is then closed. However, referral of a dispute to the committee must not prevent or delay the setting of a date for industrial arbitration.The above does not prevent the parties from demanding that a case be dealt with according to the rules of labour law, including sections 40, 45 and 48.

Page 13

Hp3 Price list - - Hp3 13Structure of the price list The price list is structured so that next to each item is(G) for basic price, (T) for transporttransport and (H) for height surcharges, so you can immediately see which items are basic prices and whether transport and height surcharges are applied to them.Surcharges or deductions are given/taken from base prices, and not from surcharge points, unless otherwise stated.

Page 14

14 - Hp3 Price listThe 2-year scaffolding training programme It is agreed between the parties that the currently existingscaffolder training - currently the 2-yearcurrently the 2-year scaffolder training programme - is promoted as much as possible.New employees must be offered a training agreement within 3 months of employment (induction period). At the conclusion of the training agreement, the company must register the employee for the training programme. In extraordinary cases where the company, not during the 3-month induction period, extraordinarily needs an extension of the induction period, the company must, within the 3-month induction period, seek and receive approval of the extension of the induction period from the training committee for the 2-year scaffolding programme.For new employees with documented knowledge, course attendance, certificate, training or credit for long-term experience in the industry, exemption may be granted after submission to the training committee.The company must, no later than 10 working days after the end of the induction period, have forwarded a documented training agreement to the body responsible for the training at any given t i m e - currently the training committee.Education programmes in the construction industry. The training agreement from BYGUD.DK must be labelled with the start date and class number. If the class number is not added by the company, it will be added by theby the construction industry's education programmes.The first 3 months after the conclusion of the training agreement are considered a probationary period, during which the employment relationship can be terminated by both parties with 1 week's notice.After the expiry of the probationary period, the employment relationship can be t e r m i n a t e d with 4 weeks' notice from the company and 4 weeks' notice from the employee. Compensation for lack of notice is calculated on the basis of salary during schooling and amounts to 4 weeks' salary (148 hours) for the company and 2 weeks' salary (74 hours) for the employee.If an apprentice is warned or dismissed, the company must inform the training committee.The remuneration in connection with the apprentice fitter's schooling corresponds to the prevailing collective agreement rate for payment of "sick pay".During the traineeship, the company pays in accordance with the Building and Construction Agreement between DIO III and 3F for both time wage and piecework.The company deducts DKK 2.00 per hour during the internship. The amount accrues to the company.The company - during the scaffolder's schooling - receives all wage loss allowances in accordance with the Labour Market Training Act, as well as all grants from the Construction and Civil Engineering Industry Training

Page 15

Hp3 Price list - - Hp3 15fund.If the subsidy from the Building and Construction Industry Training Fund lapses or is reduced, this agreement's basis for remuneration for schooling lapses, and the minimum payment rate applicable at any time under the Building and Construction Collective Agreement will be paid.The piecework during the induction period (excluding the fixed training allowance) is divided between the trained/experienced scaffolder and employees during induction in the ratio 60/40.A 3-month induction period does not start for new employees who have at least 3 months' practical experience at the time of employment and who have previously entered into a training agreement for training on the2-year scaffolder training programme.In the case of extraordinary work assignments for which extraordinary personnel are required for a limited period of time, an exemption can be obtained from the requirement for training programmes. This must be done by application to the training committee established between the parties.If the employee does not wish to enter into a training agreementduring the first 3 months of employment, but wish to continue working in the industry, an exemption must be submitted for approval by the training committee established between the parties - alternatively, the employment relationship will terminate immediately.immediately and no later than the end of the third month.Employees undergoing training as a fitter who can obtain a category C driving licence must be offered a category C driving licence.Otherwise, please refer to the employment agreement for scaffolder training, which applies throughout the country.

Page 16

16 - Hp3 Price listTraining/mentoring allowanceTraining allowance rate 1DKK 42.98Training allowance rate 1 is paid per hour to employees who have signed an agreement for training as a scaffolder and or have completed the "system scaffolding" course.The allowance applies until the training is completed with the acquisition of a training certificate.The supplement also applies to employees who have had their qualifications recognised up to and including level 2.3 of the Danish Working Environment Authority.Training allowance rate 249.38 kr.Training allowance rate 2 is paid per hour to all fully qualified scaffolders who have completed the 2-year scaffolding programme or the ERFA programme with a final coordinated practical test or passed ERFA 2 before March 2009.The allowance also applies to employees who have had their qualifications recognised up to and including level 2.4 of the Danish Working Environment Authority.Mentoring allowanceDKK 22.26Mentor allowance is paid per hour, per journeyman who fulfils the requirements described in training allowance rate 2 and who otherwise takes responsibility for an employee on probation/apprentice who fulfils the requirements described in training allowance rate 1.The mentor allowance is calculated in relation to the scaffolding apprentice's (rate 1) number of hours.Mentor allowance is not paid during school stays and absences.There can be a maximum of two journeymen with responsibility per scaffolding apprentice. Both journeymen receive the mentor allowance of DKK 22.26 per hour, per journeyman.There can be a maximum of 2 scaffolding apprentices per journeyman. The journeyman receives the mentor allowance of DKK 22.26 per hour.A shift is defined as up to 3 men.Either 2 journeymen and 1 scaffolding apprenticeor 1 journeyman and 2 scaffolding apprentices.The mentoring allowance is personal, but the journeymen can distribute the allowance themselves.

Page 17

Hp3 Price list - - Hp3 17Erection and dismantling of scaffoldingGeneral prerequisitesA1 Erection, modification and dismantlingThe scaffolding is assembled or dismantled in accordance with the industry guide for "Erection and dismantling of scaffolding"and Hp1-3. Attempts must be made to continuously move the lifting point to avoid unnecessary transport on the scaffold.A2 System scaffoldingAll scaffolding parts must be adapted to the system.A3 Settlement for the completed scaffoldingOnly the installed or dismantled equipment is charged for.Installation of frame connectors (pigtails) in frames and columns is included in the price.A4 Loading and unloading at the company's warehouse Loading and unloading of equipment at the company's warehouse is included in the prices provided that a suitable forklift truck orsimilar suitable technical equipment is made available at the company'scompany's warehouse.A5 Loading and unloading at the installation or dismantling site It is assumed that a suitable truck/crane lorry is made available for loading and unloading at the installation site or the equipment isdelivered and/or collected at the installation site.However, with the exception of minor cases where the use of a crane is not a prerequisite for health and safety.If the material is delivered and/or collected at the installation site, it must be unloaded in an appropriate manner as agreed between the labourer and the company.A6 Manual transportFor loading or unloading and transport of material at the installation site between lorry and lifting point up to and including 25 m, 7% is added to the basic transport prices (T) (see figures C1, C2, C3 and C4).When transporting equipment beyond 25 m, an additional 7% per 10 m or part thereof up to 55 m is added to the basic price (T) entitled to transport.

Page 18

18 - Hp3 Price listFor continued wheeled transport over 55 m, 7% per 20 m or part thereof will be added to the transport-eligible basic prices (T).For transport on scaffolding where there is a distance of up to 25 metres between the vehicle and the hoisting point (see fig. C4), 7% per 10 m or part thereof above 15 m measured from the hoisting point to the assembly/disassembly point is added to the basic price (T).For the transport of materials on scaffolding where there is more than 25 metres between the vehicle and the hoisting point, the transporteligible base prices (T) 7% per 10 metres or part thereof over 10 metres measured from the hoisting point to the assembly/disassembly point (see fig. C1-C3).Where equipment is hoisted with a third-party haulier, the transport is calculated from the point of sale (see figures C5-C6). Hoisting is settled on the basis of time spent.A7 Transport by forklift truck outside the company's warehouse Where a suitable forklift truck or functionally similar technical equipment is made available for the transport of materials, the following is addedthe basic eligible transport prices (T) 7% for transport up to150 m.For continued transport beyond 150 m by forklift truck or functionally similar technical equipment, an additional 7% per 50 m or part thereof is added to the basic price (T) entitled to transport.A8 Transport under special conditionsWhere special conditions apply (e.g. carriage through cellars or similar), separate arrangements will be made in accordance with the provisions of the agreement.The basic prices (G) are not halved for transport (T).A9 TravellingWhen driving more than 20 km per working day, the excess kilometres are paid at DKK 2.12 per man.A10 Height allowanceHeight allowance is only paid for points where (H) is stated next to the point. Height allowance is paid where the height is calculated from the footplate at the hoisting point up to where the equipment is mounted (see figures E1 and E2).

Page 19

Hp3 Price list - - Hp3 19From 18 m up to and including 26 m, the base price is 30% Above 26 m up to and including 32 m, the base price is 70% Above 32 m up to and including 42 m, the base price is 100% Above 42 m up to and including 52 m, the base price is 160%.For installation at heights above 52 m, an extra 20% is added for every 3 metres (e.g. 55 m = 180%).For tent covers, the height supplement is calculated from the distance to the centre point between the lower edge of the carrier strap and the upper edge of the tilt/tent.No height surcharge is paid when the equipment is moved along the scaffolding without being hoisted up or down.A11 Assembly deckAssembly tyres are provided for assembly/disassembly. Assembly decks are installed for every 2 metres in height, but at the bottom up t o 2.40 metres (does not apply to frame scaffolding). No height surcharge is paid if the assembly deck is moved up or down in the scaffolding during assembly. Assembly decks are aluminium/veneer decks, which in principle are installed crosswise in the field.If the deck is moved within 2 metres up or down during the work, the installation price is paid. If the deck is moved up or down more than 2 metres during the work, the dismantling and installation price is payable. If the installation deck is dismantled after use, a dismantling fee is payable. Installation decks are charged as aluminium/veneer decks according to size, see item 7.Transport (T) is not charged in connection with only moving the installation deck within 2 metres in an upward or downward direction, where the material is not transported horizontally.A12 RelocationRelocation (disassembly and assembly) of working decks excluding skirting, where the working deck is moved 2 metres or less from the original installation, the individual parts are only paid for at the installation prices.Relocation of working tyres 2 m or less is settled as follows: Installation price for:- Brackets, tyres, cross and longitudinal beams. Dismantling and installation price for:

Page 20

20 - Hp3 Price list- Skirting, hand/knee moulding and diagonals.There is no start-up/transport surcharge for relocation under A12.When moving temporarily movable handrail/stem fork during installation as well as dismantling within 2 metres, the installation price is charged.When moving brackets with associated bracket covers in an upward or downward direction within 2 metres, the relocation of brackets with associated bracket covers is charged at the installation price.A13 DismantlingFor disassembly, the Basic Price (G) is halved, unless otherwise stated.A14 Minimum price curveIf a piecework contract is calculated at a price currant sum of less than DKK 479.61, each of the parties is entitled to demand that the work be performed at hourly wages (the price currant sum is the sum of the price currant's "Piecework prices" items 1-25).A15 Cleaning upCleaning up after own work is included in the prices. The piecework is not completed until the crew has cleaned up after their own work. The piecework can be cleaned up according to already agreed rules for piecework.A16 Roof allowanceWhen erecting scaffolding on roofs, all equipment up to and including the first continuous deck or the first possible continuous deck, but not the deck skirting (see figures D1 and D2), is paid for with a surcharge of 200% for roofs with a slope of more than 15 degrees.The payment for the roof underlay shall be agreed separately in accordance with the provisions of the collective agreement.Roof railings, wooden ladders and roof underlay are notpriced in this price catalogue, which is why they do not trigger a roof surcharge.A17 Technical aidsSuitable technical aids are provided for assembly and disassembly. Electric hoists (wire hoists) are not currently considered a suitable technical aid for dismantling. However, the work can be agreed to be carried out on an hourly rate.

Page 21

Hp3 Price list - - Hp3 21A18 Tent workThe tents are planned to be installed in a safe and healthy manner in accordance with applicable rules and standards.A tent allowance is paid for all equipment that is included in the tent/climate shelter and which has a function in the tent cover or climate shelter, see figures A1 - B3.A tent surcharge of 47% is added to the basic prices when installing a tent roof with a pitch of up to 20degrees and when installing a building envelope (see figures A1-B3)A tent surcharge of 70% is added to the basic prices when installing a tent roof with an inclination of more than 20 degrees, seefigure A1-A5.A tent surcharge of 70% is added to the basic price when installing a tent cover where the use of a crane, platform, scaffolding deck or rolling scaffold is not possible and the tent cover can therefore only be dismantled or installed at height, without the use of a crane.possible use of the mentioned, see figure A1-A5. The pitch of the tent is measured at the tilt.Where scaffolding material is hung in the tent that is not part of the tent, no tent fee is charged for this.For closure between the roof cassettes, the current tent surcharge is paid.Where tent roofing is installed with overlapping fabrics, up to2 m overlap of the fabrics per side is included in the price (pool roof up to 1 x 2 m/saddle roof up to 1 x 2 m overlap per side).Where the tent roof is fitted with a single fabric, up to 2 metres of rolled up fabric at the ends (not part of the tent) is included in the price.A separate charge is made for kinks in the tent fly.There is no tent surcharge for assembly decks in connection with the assembly of the building envelope, assembly platform or rolling scaffold.When craning equipment with an external haulage contractor to the installation site, payment is made for time spent, except when the crane is used to erect a tent.If a scaffold is moved as a whole, e.g. platforms, tents or similar, payment is not made for the individual parts moved as a whole, but only for time spent.

Page 22

22 - Hp3 Price listIf a crane is used for assembly or disassembly, transport is not charged for the distance the crane moves the equipment during assembly or disassembly.The height surcharge is halved for parts that are assembled by crane.A19 Less challenges at the bottomMinor challenges in connection with the erection or dismantling of scaffolding in relation to ground conditions, such as pedestrians, single bushes, single bicycles and rubbish bins, are included in the prices.A20 Module lengthsThe mentioned lengths of U-/O-horizontals (with or without reinforcement), scaffolding decks, gratings, stairways, handrails, columns and skirting boards are modular lengths and can therefore vary from system to system. For example, a horizontal 2.57 m is calculated as a module length of 2.50 m.Measurements are taken centre column to centre column and rounded off to the nearest module lengthThe height of the facade frame/column is measured excluding recesses or horns.A21 HandrailThere are different types of handrails, there are torque fences, double railings and single railings, the prices below are for double railings/torque fences. If a single railing is installed or dismantled instead of a double railing/torque fence, the price is halved.There is no charge for any riveted or welded coupling in connection with double railings in gables.A22 Tyres1/1 tyre is a standard full-width tyre.3/4 is a standard tyre with a width between a full standard tyre and a half standard tyre.1/2 tyre is a standard tyre that is half the width of a full standard tyre.Retention of tyres, veneer or grating laid as a blind space is paid separately.

Page 23

Hp3 Price list - - Hp3 23A23 Box shieldIf only one screen is installed at the end of the scaffolding in connection with the installation of a box screen, only one screen is paid for, regardless of whether the screen covers the console and main decks.The box screen has a maximum height of 130 cm and is fitted with brackets for mounting on railings.A24 Mesh and plasticCalculation of m² area for installation of plastic and mesh. From wall to external pillar + length of scaffolding + in to wall x with height of plastic. There is no charge for overlaps and roll-ups on fences or similar, only for the covered area.Installation of screening mesh braided or outside the scaffolding includes min. 1 binding per m² of covered scaffolding. Overlaps and roll-up are not charged. Braided installation means that the net is inserted behind the fence.When taking down and returning the net and plastic are returned folded/rolled up in manageable bundles (can be handled by one man).Cleaning up straps and bindings after your own work is included in the price.A25 Electric hoistIn connection with the installation, relocation or dismantling of electric hoists, the price includes installation of suspension/hook and electric hoist motor.A26 Barrier equipmentThe prices for barrier equipment are not halved in the event of repatriation. There is no charge for opening and closing said barrier equipment.A27 Anti-theft protectionThe anti-theft protection is made with battens fixed to the frame/column and veneer boards.Cutting and fixing of battens is included in the prices.The height is calculated from the ground and the necessary aids are provided, including rolling scaffolding.A28 Tight coverTight covering where the covering is not supplied cut to shape and where tight cuts are made for building parts such as frames, horns, downpipes, etc. are charged per cut, cf. item 12 j.

Page 24

24 - Hp3 Price listThe surcharge is not payable for general covering or dismantling. An electric jigsaw must be made available.A29 FasteningsThe coupling for the pipe fastening is paid separately. The coupling is dismantled when unloading at the storage location.The length of the attachment is measured from the centre column perpendicular to the wall.Where the distance from the centre point of the inner column perpendicular to the wall exceeds 0.30 m and where it is necessary to install brackets with associated work decks for the installation of fastenings, this is charged according to the price curve. Bracket and tyres remain in place.A30 Drilling of holesYou only pay for the drilled holes used. Plug, eyebolt or French screw is included in the price.If a fastening is extended in exceptional cases, you pay for the individual parts.An impact drill is available for drilling.A31 Reloading at the work siteWhen reloading equipment from a large lorry to a small lorry, 7% is charged at the points where (T) is indicated.A32 Post-assemblyRetrofitting is defined as installation on a scaffolding that is or has been approved for commissioning.Retrofitting is paid at the points where retrofitting is mentioned.A33 UnitsWherever in this price catalogue it is stated"pcs." payment is made per "piece". Ex. 5 couplings equals 5 x price"m" is calculated to the nearest whole metre. Ex. 12.4 m= 12.00 x price or 12.5 m = 13.00 x price)."lbm." is charged per running metre. This means that if the length is over one metre, you pay for 2 metres. For example, a scaffolding section of 2.00 m is charged at 2 x price, but a scaffolding section of 2.01 m is charged at 3 x price, as the length starts on thenext running metre, over 2.00 m.

Page 25

Hp3 Price list - - Hp3 25"m²" is calculated in number of square metres. E.g. length x width = m² rounded off to the nearest whole square metre. Ex. 30.4 m² = 30 x price or 30.5 m²= 31 x price."Room" means the area between two columns/frames (max. length 3.50 m) on one floor height. There can be several "rooms" on top of or next to each other.A34 Tyre lock for consoleWhere tyre locks are integrated into the tyre or console, tyre locks are included in the price. If the tyre lock is not integrated into the tyre or console, the prices are settled per piece of equipment,used to lock tyres in consoles. This payment does not apply to tyre locks in main tyres.A35 Prices for tent workAll equipment that is included in tent covers and therefore triggers a tent surcharge is charged nationwide according to Hp3 Price schedule for service-related scaffolding work in Copenhagen and North Zealand's 1st and 2nd zones.2. zone.A36 Pricing of columnsWhen calculating any collective agreement increases, the increase of 1 metre is added to the pillar. The price of the other columns is calculated in relation to the 1 m column. For example, the 2m pillar price will be the 1m pillar price x 2 and the 0.5m pillar will be the 1m pillar price divided by 2.

Page 26

26 - Hp3 Price listPiecework prices1 Foot spindles and similara Foot spindlesGTHpcs.2.98 kr.b Blocking and bracingGTHpcs.3.73 kr.c Flow/pressure equalisationGTHpcs.1.97 kr.d Start u-profileGTHpcs.4.59 kr.e Tilting foot spindleGTHpcs.4.92 kr.2 Facade framesa Facade frameGTHpcs18.57 kr.b Pass-through frameGTHpcs49.84 kr.3 Pillarsa All-round starter piece longGTHpcs.4.64 kr.b Column 0.50 mGTHpcs.4.64 kr.c Column 1.00 mGTHpcs.9.28 kr.d Column 1.50 mGTHpcs.13.92 kr.e Column 2.00 mGTHpcs.18.56 kr.f Column 2.50 mGTHpcs.23.20 kr.g Column 3.00 mGTHpcs.27.84 kr.h Column 4.00 mGTHpcs.37.12 kr.4 Horizontals (O/U), reinforced horizontals (O/U) and diagonalsa Horizontal up to 0.7 mGTHpcs.5.80 kr.b Horizontal 1.0 mGTHpcs.5.80 kr.c Reinforced/horizontal 1.25 mGTHpcs.5.80 kr.d Reinforced/horizontal 1.50 mGTHpcs.5.80 kr.e Reinforced/horizontal 1.75 mGTHpcs.6.96 kr.f Reinforced/horizontal 2.00 mGTHpcs.6.96 kr.g Horizontal 2.50 mGTHpcs.6.96 kr.h Horizontal 3.00 mGTHpcs.10.44 kr.i Horizontal 3.50 mGTHpcs.13.92 kr.j Horizontal 4.00 mGTHpcs.25.52 kr.k Reinforced horizontal 2.50 mGTHpcs.18.57 kr.l Reinforced horizontal 3.00 mGTHpcs.19.72 kr.m Reinforced horizontal 3.50 mGTHpcs.23.20 kr.n Reinforced horizontal 4.00 mGTHpcs.27.85 kr.o DiagonalGTHpcs.10.44 kr.5 Temporary and permanent handrails etc.a Double railing up to 0.75 mGTHpcs.6,96 kr.b Double handrail 1.00 mGTHpcs.6.96 kr.

Page 27

Hp3 Price list - - Hp3 27Lengths are calculated in module lengths as described in section A 20(also applies to sliding horizontals and horizontals and diagonalsLengths are calculated in modular lengths as described in section A20.When installing a single railing, the price is halved, as described in section A21.Utility length up to 0.60 mNo pressure distribution, height up to 0.20 m Length up to 1.10 mE.g. for hanging aluminium stairs Utility length up to 0.60 mStandard façade frame up to 2 m high and up to 0.85 m wide. Pass-through frame up to 2.25 m high and up to 1.65 m wide.Increases on columns are charged as described in section A 36.Length up to 4.20 metres. Available with and without wedges/couplings.Minor challenges described in A19 are included in the price

Page 28

28 - Hp3 Price listc Double railing 1.25 mGTHpcs.6,96 kr.d Double handrail 1.50 mGTHpcs.6,96 kr.e Double handrail 1.75 mGTHpcs.8,70 kr.f Double railing 2.00 mGTHpcs.8.70 kr.g Double railing 2.50 mGTHpcs.8.70 kr.h Double railing 3.00 mGTHpcs.11.60 kr.i Double handrail 3.50 mGTHpcs.17.40 kr.j Double railing 4.00 mGTHpcs.23.20 kr.k Aluminium railing in a single unitGTHpcs.12.40 kr.lTemporary retractable handrail / tuning forkG compartment 10.84 kr.m Handrail clip G pcs. 6,96 kr.6 Bracketsa Bracket 0.40 m= 1/2 tyreGTHpcs.12.25 kr.b Bracket 0.70 m= 1/1 tyreGTHpcs.16.83 kr.cBracket 1.20 m= 1 x 1/1+ 1/2tyresGTHpcs.21.42 kr.dBracket 1.50 m= 2 x 1/1 tyresGTHpcs.30,62 kr.eTyre insert (loose steps) (= 1/1 tyre)GTHpcs.16.83 kr.fStandard bracing tube w/couplingand forkGTHpcs.14.27 kr.g Standard bracing tubeGTHpcs.16.68 kr.w/couplingsh Locking profile rail for console deckGTHpcs.4.43 kr.i Hanging monitor consoleGTHpcs.33,39 kr.7 Aluminium/veneer and composite decks and stairways and aluminium gratings1 Tyres in 1/1 width in systema 0.75 mGTHpcs.9.28 kr.b 1.00 mGTHpcs.9.28 kr.c 1.25 mGTHpcs.9.28 kr.d 1.50 mGTHpcs.9.28 kr.e 1.75 mGTHpcs.13.92 kr.f 2.00 mGTHpcs.13.92 kr.g 2.50 mGTHpcs.13.92 kr.h 3.00 mGTHpcs.18.57 kr.

Page 29

Hp3 Price list - - Hp3 29Lengths are calculated in module lengths as described in section A20Up to 3 tyres (tyres not included) tyre locks are included.Total unit covering from 0.35 to 1.50 metres with hand, knee and foot rails, excluding restraintWhen moving temporarily movable handrail/stem fork during assembly as well as disassembly w i t h i n 2 metres, payment is made at theinstallation price. Settlement is per room. Settlement per room is described in section A33.Clips for installation of permanent sliding railingWidth 1 x 1/2 deck in system - up to 0.40 m, incl. integrated deck lock Width 1 x 1/1 deck in system - up to 0.70 m incl. integrated deck lock, see item A34Width 1 x 1/1 + 1 x 1/2 tyres in system - up t o 1.20 m incl. integrated tyre lock, see section A34Width 2 x 1/1 tyres in system - up to 1.50 m, incl. integrated tyre lockU-/O profile tube welded to 2 couplings, mounted to share a frame with inserted tyreLength up to 2.30 m, with one fixed coupling/wedge included.Lengths up to 2.30 m, with two fixed couplings/wedges are included.Up to 0.75 m in length

Page 30

30 - Hp3 Price listin 3.50 mGTHpcs.23.20 kr.2Tyres in 3/4 width in systema0,75 mGTHpcs.6,96 kr.b1,00 mGTHpcs.6.96 kr.c1,25 mGTHpcs.6.96 kr.d1,50 mGTHpcs.6,96 kr.e1,75 mGTHpcs.9.28 kr.f2,00 mGTHpcs.9.28 kr.g2,50 mGTHpcs.9.28 kr.h3,00 mGTHpcs.13.92 kr.i3,50 mGTHpcs.17.40 kr.3Tyres in 1/2 width in systema0,75 mGTHpcs.4.64 kr.b1,00 mGTHpcs.4.64 kr.c1,25 mGTHpcs.4.64 kr.d1,50 mGTHpcs.4.64 kr.e1,75 mGTHpcs.6.96 kr.f2,00 mGTHpcs.6.96 kr.g2,50 mGTHpcs.6.96 kr.h3,00 mGTHpcs.9.28 kr.i3,50 mGTHpcs.11.60 kr.j4,00 mGTHpcs.23.20 kr.4Driveway tyres in systemaDriveway 2.00GTHpcs.13.92 kr.bStaircase 2,50GTHpcs.18.57 kr.cStaircase 3.00GTHpcs.23.20 kr.dLadder/ladderGTHpcs.5.01 kr.8 Half-width steel deck/grating in systema0,75 mGTHpcs.6.96 kr.b1,00 mGTHpcs.6.96 kr.c1,25 mGTHpcs.6.96 kr.d1,50 mGTHpcs.6,96 kr.e1,75 mGTHpcs.9.28 kr.f2,00 mGTHpcs.9.28 kr.g2,50 mGTHpcs.11.60 kr.h3,00 mGTHpcs.17.40 kr.i3,50 mGTHpcs.23.20 kr.j4,00 mGTHpcs.29.00 kr.9 Trolleysa1.25 m x 0.50 m wooden trolleyGTHpcs.9.28 kr.

Page 31

Hp3 Price list - 31Excluding ladder/ladderUp to 3 m floor heightLengths are calculated in module lengths as described in section A20Up to 0.75 m in lengthUp to 0.75 m in lengthUp to 2.00 m in lengthUp to 0.75 m in length

Page 32

32 - Hp3 Price listb 2.20 m x 0.38 m wooden trolleyGTHpcs.11.60 kr.c 2.20 m x 0.50 m wooden trolleyGTHpcs.16.25 kr.d2.20 m x 0.50 m aluminium and compositetrolleyGTHpcs.11,60 kr.e2.20 m x 0.50 m aluminium and compositeaccess trolleyGTHpcs.16.25 kr.10 Stair treads, ladders and planksaAluminium stair treads with landings excl.GTHpcs.57,03 kr.w/ bracket suspended3 m above ground level 3 m above ground levelfenceb Aluminium stair rail with loose landingsGTHpcs.55,77 kr.c Steel stair rail with loose landingsGTHpcs.69,70 kr.d Landing for staircaseGTHpcs.13.94 kr.e Fence for stairwaysGTHpcs.14.88 kr.f STV leaderGTHpcs.33.23 kr.g Scaffolding planksGTHpcs.13.62 kr.11 Skirting boardsa Skirting 0.75 mGTHpcs.6.96 kr.b Skirting 1.00 mGTHpcs.6.96 kr.c Skirting 1.25 mGTHpcs.6.96 kr.d Skirting boards 1.50 mGTHpcs.6,96 kr.e Skirting boards 1.75 mGTHpcs.9.28 kr.f Skirting boards 2.00 mGTHpcs.9.28 kr.g Skirting boards 2.50 mGTHpcs.9.28 kr.h Skirting boards 3.00 mGTHpcs.10.44 kr.i Skirting boards 3.50 mGTHpcs.11.60 kr.j Skirting boards 4.00 mGTHpcs.13.92 kr.k Skirting board/baseboard locking bracketsGTHpcs.1,26 kr.12 Screens and veneer sheetsaBox screens up to and including 1 m e t r e ,GTHcompartment31.10 kr.bBox display over 1 m - 1.8 mGTHrum56.45 kr.suspendedc Dense cover with veneer 12 mmGTHm²9.12 kr.d Dense cover with veneer 16 mmGTHm²10.65 kr.e Dense cover with veneer 18 mmGTHm²13.01 kr.f Dense cover with veneer 22 mmGTHm²18.37 kr.gAnti-theft protection per covered m² up to GTHm²22.96 kr.hAnti-theft protection per covered m² above GTHm²38.26 kr.

Page 33

Hp3 Price list - - Hp3 33Planks for scaffolding 2" x 7" up to 4 mThe lengths are calculated in module lengths as described in section A20Where veneer is used to close between decks, the price is excluding retentionExclusive ladder/ladderUp to 2 m floor height. Where staircases less than 2 m are used, staircases are charged forUp to 0.75 mRead about screens in section A23 and rooms in section A33Read about screens in section A23 and rooms in section A33 Incl. retention.Incl. retention Incl. retention Incl. retention Incl. retentionThe anti-theft protection is made with battens fixed to the frame/column and veneer panels. Read more under item A27The anti-theft protection is made with battens fixed to the frame/column and veneer panels. Read more under point A27

Page 34

34 - Hp3 Price listaAluminium/bracket fastening 0 m - 1.30 mbAluminium/bracket fastening 1.31 m - 1.80 mG T H pcs. 16.25 kr.G T H pcs. 23.20 kr.c Steel pipe fastening 0 m - 1.30 m G T H pcs. 20.88 kr.dSteel pipe fastening 1.31 m - 1.80 mG T H pcs. 25,52 kr.e Wall brace alu. 0 m - 1.30 m G T H pcs. 18.57 kr.f Aluminium wall brace 1.31 m - 1.80 m G T H pcs. 23.20 kr.g Wall brace steel 0 m - 1.30 m G T H pcs. 23.20 kr.h Wall brace steel 1.31m - 1.80m G T H pcs. 29.00 kr. i Drilling holes up to and including 12 mm pcs. 5.22 kr.jDrilling holes over 12 mm to 16 mmkDrilling holes in concrete up to and including 12 mmlDrilling holes in concrete over 12 mm to 16 mmmHole sealing with putty, mortar, paint, sciliconepcs. 12,77 kr.pcs. 12.77 kr.per piece 19.72 kr.per piece 3.83 kr.n Close off hole with plug pcs. 3.05 kr.14 Pipes, couplings and consumablesa Aluminium/steel scaffolding tubes up to 1.5 mGTHpcs.6.12 kr.b Aluminium scaffolding tube over 1.5 mGTHm4.43 kr.c Steel scaffolding tubes over 1.5 mGTHm6.12 kr.d CouplingsGTHpcs.4.43 kr.e Scaffolding clampsGTHpcs.4.43 kr.fBindings with binding wire orequivalentGTHpcs.4.43 kr.g Cup protector with or withoutGTHpcs.2,32 kr.iCut-out for dense veneer alongfacadepcs. 25.75 kr.13 Anchoring, eyebolts, drilling etc.reflectiveh Beam riderGTHpcs.13.92 kr.in Sko AVS (to continue building)GTHpcs.13.92 kr.

Page 35

Hp3 Price list - - Hp3 35Price is per cut-out. Not available in connection with ordinary veneer covering. Read more about item A28Read more item A30 Read more item A30Only the drilled holes used are paid for. Read more item A30 Only the drilled holes used are paid for. Read more about item A30 Only the drilled holes used are paid for. Read more about item A30You only pay for the drilled holes used. Read more about item A30Example closing with 1 x putty + 1 x paint= 2 x hole closing = 2 x price per pieceScaffolding tubes up to 1.50 m in steel or aluminium.Scaffolding tubes over 1.5 m are rounded off to the nearest whole metre (e.g. 12.4 m = 12.00 m or 13.5 m = 14.00 m), as described in section A33Scaffolding tubes over 1.5 m are rounded off to the nearest whole metre (e.g. 12.4 m = 12.00 m or 13.5 m = 14.00 m), as described in section A33With up to 2 bolts or wedgesProtective plastic mounted around kob, on column, to create visibility. Any restraint with binding must be paid separately.

Page 36

36 - Hp3 Price list17 Electric hoist15 Plastic (Reinforced plastic sheeting)a Reinforced plastic film width2,25 mGHm²6.74 kr.b Reinforced plastic film width3,30 mGHm²7.60 kr.c Reinforced plastic film width4,00 mGHm²8.04 kr.d Laying reinforced plastic sheetingGHm²3.97 kr.e Fixing along wallGHlbm.15.30 kr.f Surcharge for reuse of reinforcedm² (1.90) (DKK)plastic film/pressing ring16 NetaNetGm²3.17 kr.bOffshore gridGm²6.74 kr.cIf the net is required to be mounted horizontallym² 25%d Surcharge for re-use of mesh m² 0.95 kr.a Electric hoist (unladen weight up to 15 kg) G T H pcs. 170,08 kr.bMoving electric hoist (unladen weight up to 15 kg)G T H pcs. 255,12 kr.c Electric hoist (unladen weight up to 50 kg) G T H pcs. 336,76 kr.dMoving electric hoist (unladen weight up toG T H pcs. DKK 505.1450kg)eSurcharge for retrofitting electric hoist25%18 ShaftaPlastic shaft tubeGTHpcs.43.32 kr.bPlastic branch pipeGTHpcs.63.36 kr.cPlastic funnel plastic/aluminium.GTHpcs.43,32 kr.dSteel liner for plastic shaftGTHpcs.6,34 kr.eSteel shaft tubeGTHpcs.79.75 kr.fSteel branch pipeGTHpcs.95.05 kr.gSteel funnelsGTHpcs.79,75 kr.hSurcharge for retrofitting a shaft25%19 Girders, bridges and accessories for tents etc.a 0.45 m aluminium girderGTHm19.02 kr.b 0.45 m steel girderGTHm33.27 kr.c 0.75 m aluminium carrierGTHm31.69 kr.

Page 37

Hp3 Price list - - Hp3 37Accessories described in section A25 are included in the price.Incl. min. 1 binding per m² to be settled per m² covered Incl. min. 1 binding per m² to be settled per m² covered Incl. min. 1 binding per m² to be settled per m² coveredIncl. cutting to size. Paid per m² covered (horizontal installation) With 1" x 4" boards etc. incl. fastening to wall with nail plugReturned at dismantling and collection folded/rolled up in bundles A24Returned on collection and removal folded/rolled up in bundles A24Where nets are required to be installed horizontally, a surcharge of 25% of the basic price (G) is payableSurcharge per m² of uncovered scaffolding, this surcharge is not applied for dismantlingWhere the Electric hoist is moved along the scaffold (not hoisted down/up), no height surcharge is payable.Where the electric hoist is moved along the length of the scaffolding (not hoisted down/up), no height supplement is paid.The surcharge is not applied when the electric hoist is moved within the same case, see section A32Up to 1.25 m high Up to 1.25 m high Up to 1.25 m high Up to 1.25 m high Up to 1.25 m high Up to 1.45 m high Up to 1.45 m high Up to 1.45 m highItems 18 a - g are subject to a 25% surcharge for retrofitting, see item A32Without integrated channel Without integrated channel Without integrated channel Without integrated channelCalculation of m² area, as described in section A24 Cleaning up after your ownlabour is included in the price, as described in section A15Surcharge per m² of covered scaffolding, this surcharge is not given for dismantlingCalculation of m² area, as described in section A24 - cleaning up after ownlabour is included in the price, as described in section A15

Page 38

38 - Hp3 Price listh 0.80 m tilt beam w/ keder railGTH61.64 kr.i Tie rods for girders incl. 4 boltsGTHpcs.15,85 kr.jConnecting pegs for tipping beams incl.4 boltsGTHpcs.23,77 kr.k Tilt bracket incl. 8 bolts for 0.45 mGTHpcs.54.53 kr.wU-rails for kitesGTHlbm.11.48 kr.xAluminium bridge excl. railingGTHlbm.16.80 kr.yAquapit (Fig. B1)GTHpcs.9.28 kr.zColumn with curvature for building envelope(Fig. B2)GTHpcs.9,28 kr.æRoof bars (Fig. B3)GTHpcs.63.81 kr.20 Clampingsignalling equipmenta Road sign with basepcs.22,96 kr.b Barrier cylinder w/ footpcs.11.48 kr.c Red/white marker boardpcs.6,98 kr.21 Other equipmenta Stand for ballast railings G T H pcs. 56,02 kr.d 0.85 m aluminium beamGTHm39.48 kr.e 0.75 m steel girderGTHm39.48 kr.f 0.35 m triangle carriersGTHm39.48 kr.g0.80 m aluminium carrier withkeder railGTHm43.37 kr.kitesl Aluminium kite guide for 0.45 m kitesGTHpcs.11.26 kr.m Aluminium kite guide for 0.85 m kitesGTHpcs.13.92 kr.n Wheel bracket for 0.45 m kitesGTHpcs.15.30 kr.o Aqua tyresGTHm²9.50 kr.p Girder guide for longitudinal beamsGTHpcs.15.30 kr.q Keder rails incl. couplingGTHlbm.22.96 kr.r Canopy fabric GTHm²7.14 kr.sSeam beam incl. roof rail andscrewsGTHlbm.11.88 kr.t Tarpaulin for seam beamGTHm²7.14 kr.u Steel crane bracket incl. fenceGTHpcs.61,22 kr.vRailing holder for mounting ongirdersGTHpcs.22,96 kr.

Page 39

Hp3 Price list - - Hp3 39Barriers are charged as described in section A26 (and White Paper)Without integrated channel rail Without integrated channel railDimensions up to 0.35 m x 0.35 m x 0.35 m in steel/aluminiumWith integrated channel up to 0.80 m height incl. assembly pegs.With built-in channel up to 0.80 m high. Price/100 x number of cm length per tilting beam (measured at the top edge of the tilting beam excluding any.assembly pegs)Up to 0.85 m longUp to 0.85 m longNot including bracing fence. Bracing fences are invoiced as handrail item 5Over 0.45 m and up to 0.85 m aluminium girders. Per square metre coveredPer square metre coveredIncl. staples for nail beam per m²Length over 3.5 mFeet up to 30 kg. Feet up to 12 kg.Stand for ballast railing incl. ballast, crane up, blocks included. Excluding railing.

Page 40

40 - Hp3 Price listaInstallation of scaffolding on roofs withover 15 degrees slope200%25 Mounting deck24 Moving the working deck23 Roof allowanceaTents and enclosures with up to47%20 degree pitchbTents with more than 20 degrees70%inclinationExceptionally specialised assemblycof tents where nothing else is possible.70%26 Height allowancea From 18 m up to and including 26 m30%b Over 26 m up to and including 32 m70%c Over 32 m up to and including 42 m100%d Over 42 m up to and including 52 m160%e Over 52 m, 20% per 3 m is added20%27 Start-up and transport surcharge1 Manual transport to hoisting pointa Start-up up to and including 25 m7%b Per commenced 10 m up to 55 m7%c Per commenced 20 m over 55 m7%2 Manual transport on scaffolding (up to 25 m from vehicle to hoisting point)a From hoisting point up to and including 15 m0%b Per 10 metres or part thereof over 15 metres7%3 Manual transport on scaffolding (over 25 m from vehicle to hoisting point)a From hoisting point up to and including 10 m0%b Per commenced 10 m over 10 m7%4 Transport with forklift/telescopic loader to hoisting pointa Up to 150 m7%b Per 50 m or part thereof over 150 m7%22 Tent surcharge

Page 41

Hp3 Price list - - Hp3 41Payment for relocation (dismantling and assembly) of work decks, excluding skirting, isdescribed in section A12Settlement of mounting tyres is described in section A11Settlement of height surcharges is described in section A10Settlement of start-up and transport surcharges is described in sections A6 - A8 - Base prices are not halved for transport.See figure C1-C3See figure C4See figure C1-C3Add the base prices of the parts included in the tent or building envelope, see figure A1-B3 Plus the base prices for t h e parts included in the tent, see figure A1-A5Where the use of a crane, platform or rolling scaffold is not possible andthe tent canopy must be dismantled/assembled in height without these, see figure A1-A5Further described in section A16 and figures D1-D2Further described in section A18 and figures A1-B3

Page 42

42 - Hp3 Price listThis price schedule replaces all previously concluded protocols/agreements of a price and labour nature.Copenhagen, March 2025(according to the collective agreement renewal per March 2025)United Federation of Danish Trade Unions DI DIO III

Page 43

Hp3 Price list - - Hp3 43

Page 44

44 - Hp3 Price listTent allowanceSupporting figuresFigure A1 - Tent allowance

Page 45

Hp3 Price list - - Hp3 45Tent surchargeFigure A2 - Tent surcharge

Page 46

46 - Hp3 Price listTent surchargeFigure A3 - Tent surcharge

Page 47

Hp3 Price list - - Hp3 47Tent a d d -o n KipFigure A4 - Tent surcharge

Page 48

48 - Hp3 Price listKipTent add-onFigure A5 - Tent surcharge

Page 49

Hp3 Price list - - Hp3 49Figure B1 - Tent allowance building envelopeTent allowance

Page 50

50 - Hp3 Price listFigure B2 - Tent allowance building envelopeTent allowance

Page 51

Hp3 Price list - - Hp3 51Figure B3 - Tent surcharge for building envelopeTent allowance

Page 52

52 - Hp3 Price listFigure C1 - Horizontal transport25 m45 m3rd trans2nd trans25 m35 m1st trans(Crane 25 m)20 m10 m0 m10 m20 m4. trans3. trans3. trans4. transLifting point

Page 53

Hp3 Price list - - Hp3 53Figure C2 - Horizontal transport(Crane 10 m)25 m2nd trans35 m1st trans25 m(15 m)20 m10 m0 m10 m20 m3. trans2. trans2. trans3. transLifting point

Page 54

54 - Hp3 Price listFigure C3 - Horizontal transport25 m35 m2nd trans1st trans(25 m)25 m20 m10 m0 m10 m20 m3. trans2. trans2. trans3. transLifting point

Page 55

Hp3 Price list - - Hp3 55Figure C4 - Horizontal transport25 m25 m15 m0 m15 m25 m2. trans1. trans1. trans2. transLifting point(15 m)(Cranes10 m)1st trans

Page 56

56 - Hp3 Price list2. trans35 mFigure C5 - Horizontal transport10 m0 m 10 mLifting pointCentre and total enclosure point1. trans1.trans2. trans25 mHoisting point10 m2.trans(0) (m)2. trans10 m2nd trans20 m20 m10 m0 m10 m3. trans2nd trans2. trans3rd transLifting point1st trans2. trans35 m25 m25 m15 m0 m15 m2. trans1. trans1. trans2. transLifting point1. trans2. trans35 m

Page 57

Hp3 Price list - - Hp3 571. transFigure C6 - Horizontal transport15 m0 m 15 mLifting pointLifting point15 m1st trans(0) (m)1st trans15 m1st trans1st trans1. trans25 m25 m1. trans15 m15 m0 m15 m0 m1. trans1. trans1. trans1. transLifting pointLifting point1. trans1. trans15 m15 m0 m0 m15 m1. trans1st trans1. trans1. transLifting pointLifting point1st trans25 m25 m1. trans1. trans

Page 58

58 - Hp3 Price listFigure D1 - Roof extension

Page 59

Hp3 Price list - - Hp3 59Figure D2 - Roof allowance

Page 60

60 - Hp3 Price listFigure E1 - Height allowance

Page 61

Hp3 Price list - - Hp3 61Figure E2 - Height surchargeMounting point determines whether height allowance is paidIHeight surcharge is paid by bracket, fastening, frame C and deck in b.No surcharge is paid for frame b, railing and skirting.IIHeight surcharge is paid for handrail, bracket, fixing, frame c and deck in b. No surcharge is paid for skirting and frame b.IIIHeight surcharge is paid for handrail, skirting and frame b, bracket and fastening. No surcharge is paid for tyres in frame a.