simplebooklet thumbnail

Step by step guide on how to pitch the Crua Loj six person tent.

Crua Loj TT6 Pitching instructions The tent comes in 3 bags 1 The outer tent with carpet footprint and stakes 2 The inner tent and poles 3 The outer tent poles Remove the contents from the bags Erect the outer tent first 2 people required Step 1 Lay out the footprint first staking the corners Fig 1A Lay out the outer tent next green flysheet facing up on top of the footprint Fig 1B Fig 1A Fig 1B 1
Crua Loj  TT6  - Pitching instructions  The tent comes in 3 bags 1. The outer tent with carpet, footprint and stakes 2. Th...
Step 2 Tent pole construction Connect tent poles note to keep side poles and top poles separate to ease the process Fig 2A Insert poles through sleeves both sides and top and connect only after all have been inserted through the sleeves Do not connect black clips to the side poles yet NOTE THE COLOUR CODING Fig 2B Fig 2A Fig 2B 2
Step 2  Tent pole construction          Connect tent poles, note to keep side poles and top poles separate to ease the pro...
Step 3 Insert silver buckle attached to the groundsheet into the bottom of the side poles ensuring to do one side entirely before moving to the other side Fig 3A It s important to pull the floor and flysheet into position before inserting second side of clips Fig 3B Once all the poles are through and clipped stack them on top of each other Fig 3C Stand the tent up vertically and stake at least 2 of the rear guy lines for greater support during this action You can tighten these later Walk the tent forward separating each set of poles as you do so Fig 3D Fig 3A Fig 3B Fig 3C Fig 3D 3
Step 3                        Insert silver buckle  attached to the groundsheet  into the bottom of the side poles, ensuri...
Step 4 When the tent is spread evenly proceed to stake down the front and side guylines Also stake the bottom of the poles once they are in place Tighten the rear guy lines as required Fig 4A Realign the footprint until it exactly meets the front of the tent and placed consistently under the tent Fig 4B Use the black aluminium poles to extend the front awning as required Note when using the front awning utilise the guy lines at the top of the awning and stake them out at an angle from the tent Fig 4C Open doors windows as required Run light aluminium pole through sleeves of side awning and secure with Velcro fastened receivers Fig 4D Fig 4A Fig 4B Fig 4C Fig 4D 4
Step 4                         When the tent is spread evenly proceed to stake down the front and side guylines. Also stak...
Step 5 Inner Tent Construction Stage 1 Open the contents of the inner tent bag and remove the insulated material and the inner poles Lay out the inner tent inside the outer tent and clip into place using the buckles along the ground of the sleeping area Fig 5A Open the front doors of the inner tent as it lays on the ground to allow access to stand during installation Fig 5B Start to clip in inner tent in place but to no more than halfway up the walls Fig 5C Insert poles into the 3 pins at the back of the inner tent floor level Note yellow pole is in the middle and red at both sides Clip the tent onto these poles as well Fig 5D Fig 5A Fig 5B Fig 5C Fig 5D 5
Step 5  Inner Tent Construction Stage 1                       Open the contents of the inner tent bag and remove the insul...
Stage 2 Continue to clip the inner tent into position using both the clips on the outer tent and onto the 3 poles Fig 5E Use the Velcro fasten straps on the top of the outer tent to keep the inner tent poles in place Fig 5F Finish the poles through the eyelets at the top of the inner tent Fig 5G Install separation wall into inner tent if required Tie up doors mesh Fig 5H Fig 5E Fig 5F Fig 5G Fig 5H Lay carpet into living area matching buckles with corners Secure into place Fig 5I Fig 5I 6
Stage 2                      Continue to clip the inner tent into position, using both the clips on the outer tent and ont...
Step 6 Taking down the tent Take the inner tent down first starting from the top proceeding to unclip from wall and poles Once unclipped remove poles and fold them up Fold the inner tent as it was first left then right and roll up tightly Use the straps provided to tighten this even further Fig 6A When Inner Tent is down remove stakes from side guy lines and base of poles and take down front awning if it was being used Remove carpet and fold One person to each side and remove stakes from front guy lines Walk the front of the tent backwards to the second last pole and remove back guy lines and stakes and let the ten drop flat on the ground After the air escapes disconnect silver pins from the bottom of the poles one side and then the other Disconnect the poles and remove through sleeves fold and put back into pole bag Fig 6B Fig 6A Fig 6B 7
Step 6  Taking down the tent                                          Take the inner tent down first, starting from the to...